Download presentation
Presentation is loading. Please wait.
Published byAaron Beebee Modified over 10 years ago
1
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 AGATA Campaign at GANIL
2
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Outline Status of AGATA Preparation to the GANIL campaign Performances simulations of the AGATA array AGATA@GANIL: Project Organization and Planning Report of the working Group
3
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 2010 2012 LNL : 5TC AGATA D.+PRISMA Total Eff (compact). ~6% Status of AGATA: LNL Campaign in 2010-2012 Lifetime measurement of the 6.79 MeV state in 15 O. The energy and angular resolution of the AD will allow to reach a lifetime measurement in the fs range C. Michelagnoli et, in preparation C. Louchard et al, to be submitted Successful demonstration phase with a limited number of detectors concluding a long period of R&D (~ 70 NIMA papers in ~ 10 years (2002-2012) ) First physics results are submitted or drafted within the collaboration
4
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 2012 GSI/FRS 5TC+3 DC AGATA D.+PRISMA AGATA @ FRS Total Eff. ( =0.5) ~ 10% Total Eff (compact). ~6% 35 LoI have been submitted in May 2010 Conveners: M. Bentley, W. Korten 144 shifts (46 days) have been allocated 4 Weeks of data taking from October to November 2012 + several commissioning runs Workshop hold in December for the second beam period New proposals submitted for 6 weeks Next beam time in November-December 2013 (…2014) Quadratic evolution of collectivity in the 208 Pb vicinity (S429) The Pygmy Dipole Resonance in 64 Fe and the properties of neutron skin (S430) Coulomb-excitation of the band-terminating 12 + yrast trap in 58 Ni (S433) Shape evolution in very-neutron rich Zr isotopes (S428) 2010 2012 LNL : 5TC Status of AGATA: GSI Campaign in 2012-2014
5
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 GSI Beam time 19/20 crystals running 21 channel fully instrumented 29 th of January 2013 32 capsules have been produced 24 are operational 3 to be fixed after failure 5 waiting to be fixed after LNL annealing Status of AGATA: the array The remaining 4 electronic chains in final stage of test 25 capsules fully instrumented with electronic version 1 for 2013 End 2012 : 3 more capsules have been ordered by IN2P3 (2) and Spain (1) By end of 2013 : 35 capsules By the end of the GANIL phase 1 45 capsules) New electronic to equip the next 20 capsules (1 ) Padova and Orsay designs evaluated by 7 international experts Padova electronic choosen in Autumn 2012; to be delivered in mid-2013
6
E.Clément Novembre 2011 Preparation to the GANIL campaign E.Clément GANIL Scientific Council February 2013
7
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 : Campaign spokesperson : S. Lenzi (Univ. Padova) Call for LOI sent in October 2012: dead line 8 th February 2013 1 st workshop on the18 th - 20 th of February organized at GANIL,dedicated to the physics of the GANIL Campaign using stable and radioactive beams (SPIRAL1) Create the basis for defining the priorities for a detailed scientific program of the campaign Assess the technical feasibility, constrain the infrastructure and ancillary detectors integration. Identify common setup to be run in a row or physics case and collaborations A summary of the physics objectives will be presented at the next SC for evaluation 1 st PAC including AGATA proposal 13 th AGATA week organized on the next 20 th -22 nd of March at GANIL The GANIL Campaign 2014 VAMOS cave toward 1
8
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 -ray spectroscopy of very neutron-rich nuclei populated in Deep Inelastic Collisions or induced fission using VAMOS to identify the reaction products in Q, A and Z. Spectroscopy of heavy elements towards SHE and N=Z nuclei populated by fusion –evaporation with VAMOS in gas-filled mode. Spectroscopy at high spins after fusion-evaporation Spectroscopy of -rich nuclei at the N=Z line using the Nwall and DIAMANT Spectroscopy using existing and new SPIRAL1 beams Ensuring these physics cases with the appropriate ancillaries detectors Mechanical integration
9
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Charged particle array for transfer reaction MUST2/TIARA : (d,p) etc … program with SIB and RIB Charged particle array for prompt tagging : DIAMANT Neutron detector (Nwall) Charged particle array for Recoil Decay Tagging : MUSETT Scintillator : BaF2 array, LaBr3 Future detector : NEDA (n), GASPARD ( ?), PARIS (LaBr3) In G1 coupled to VAMOS (+ EXOGAM2): SIBs, RIBs AGATA 1 at GANIL : Ancillary devices At 0° as separator (vaccum/gas-filled) Angles >10 deg for fission & MNT
10
E.Clément Novembre 2011 VAMOS The VAMOS spectrometer is expected to play a major role in the campaign Upgrades are still possible in the dispersive mode as magnetic spectrometer Fully operational now ( M. Rejmund et al, NIM A 646 (2011) 184-191 ) A test in gas-filled mode has shown the competitivity of the setup Optimum configuration to be funded ANR (French Research Funding Agency) request for the gas-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen & Ch. Schmitt) If funded in 2013, should be operational mid-2015 E.Clément GANIL Scientific Council February 2013
11
E.Clément Novembre 2011 Performances simulations of the AGATA array E.Clément GANIL Scientific Council February 2013
12
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 J. Ljungvall (CSNSM) M. Labiche (STFC) for the AGATA collaboration - Preliminary × ~ 1.25 × ~ 1.5 AGATA nominal 233 mm EXOGAM nominal 145 mm Performance of the AGATA array AGATA should leave GSI with a minimum of 25 capsules (5ATC + 5ADC) fully instrumented Additional detectors will be delivered during the campaign End of the campaign : 45 capsules covering 1 LNL phase GSI phase
13
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 =12% More than efficiency, AGATA provides higher sensitivity × ~ 4.7 × ~ 12 Performance of the AGATA array
14
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 EXOGAM, LaBr3, BaF2 … AGATA Configurations at GANIL E. Farnea et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343
15
E.Clément Novembre 2011 AGATA@GANIL Project Organization and Planning E.Clément GANIL Scientific Council February 2013
16
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Local organization done Tasks distribution and their detailed description were distributed GANIL project : Set of spec delivered, detailed planning, resources evaluation, budget, development plan, PBS, WBS distributed Security/safety : Installation description for DIRC01 : 1 st draft released, risk analysis beginning of 2013 The call for tender, to be launched by May 2013 after GANIL management review, are under preparation Specific infrastructure to be delivered in December 2013 In 2012, ~4 FTE have worked on the project (20 persons involved at GANIL) For 2013-2014, ~80 m.month are evaluated Organisation
17
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Schedule (assuming that material from GSI arrive on Jan-Feb 2014) Gas-filled installation expected in mid-2015 if funded in 2013 GANISOL beams available for physics beginning of 2016 No SPIRAL1 beam in 2014-2015 GANIL has requested the host of AGATA until end of 2016 T2-12T3-12T4-12T1-13T2-13T3-13T4-13T1-14T2-14T3-14T4-14…T4-16 Mechanics STFC Design GANIL Impl IPHC construc Mounting Infrastructure det GANIL Studies Collecting items Installation LN2, AF GANIL Studies Collecting items InstallationTest DAQ Hardware GANIL Studies Collecting items InstallationTest DAQ Software Prep. Test Processing Room Renov Aire Proj AGATA infra Detector Mounting Source & Commi Expt …
18
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
19
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 ~150 k€ ~17k€ Processing room 019 Upgrade ~ 102k€ Detector lab infrastructure ~15 k€ Cryogenic upgrade, connection ~25 k€ Total investment cost ~380 k€ Optical fibers links ~70k€
20
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Budget : Total cost investment ~380k€ 237 k€ guaranteed by GANIL for 2013 to be completed in the 2014 request IPHC requested 90k€ from IN2P3-AP for the mechanic ANR (French Research Funding Agency) request for the gas-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen & Ch. Schmitt) Loan of material from LNL & GSI (cooled cabinet, racks, water distribution, Optical link) under evaluation
21
E.Clément Novembre 2011 Report of the working Groups E.Clément GANIL Scientific Council February 2013
22
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Detectors support design done by STFC Daresbury in close collaboration with GANIL GANIL designs the additional platform GANIL takes in charge the integration work Projection T1 -2013 9 months of construction estimated starting by T1-2013 On-going collaboration with the IPHC workshop for the construction of the support Workshop for the extended platform not yet defined I. Burrows (STFC) M. Ozille, P. Gangnant (GANIL) Mechanic
23
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 I. Burrows (STFC) M. Ozille (GANIL) G. Gaudiot (IPHC) Mechanic First 2D projections have been released in January On-going validation and fine cost estimate Mechanical stress and rigidity calculations validated
24
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 M. Ozille (GANIL) Mechanic
25
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 M. Ozille, P. Gangnant, G. Fremont (GANIL) GANIL is in charge of the beam section and target chamber design for most of the experiment Specific configuration will be treated case by case Target loader : Detailed design on going by GANIL Final decision will be taken after the physics workshop Target loader and beam line
26
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Salle G1 AGATA EXOGAM Elec. AGATA Elec. DSS 300 optical wires Water cooling 26° 8 bars 27 kW UPS L. Menager, J. Ropert, JL. Foucher (GANIL) Integration Cryogenic distribution
27
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 L. Menager, M. Jean, N. Menard (GANIL) The foreseen room required important investment (refurbishment, electricity, water cooling, air conditioning …) G1 cave Integration
28
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Performance simulations :on-going (final release in February) Electronic coupling: on-going (several meeting already done, transfer of knowledge in GSI during 2013) Detector:starting (transfer of knowledge in GSI during 2013) Data flow, DAQ:on-going (several meeting already done, no problem anticipated) Mechanic design : on-going (final design review) Optical link :on-going (purchase order expected on April) Data analysis :starting (first meeting on the first week of Dec.) AutoFill-cryogenic :on-going (definition of the installation, call for tender in April) Infrastructure :on-going (needs identified, final design review on going)
29
E.Clément Novembre 2011 Conclusion E.Clément GANIL Scientific Council February 2013 The AGATA physics prospective is on-going and physics objectives will be presented at the next CS for evaluation after the workshop organized in February 2014-mid 2015 : AGATA-VAMOS+ “light” ancillary 2015 : gas-filled, NWALL 2016 : SPIRAL1 beams The AGATA project at GANIL made progress in all different items with a particular attention on the mechanic and the integration The transfer of knowledge on detectors and electronic will be organized in 2013 during off and on- beam period at GSI with GANIL technical staff. Mechanical construction should start soon, delivery by end of 2013 Call for tender are expected to be sent by May 2013 for infrastructure Data Acquisition and Data analysis preparation will progress over 2013 GANIL technical involvement is already significant Budget guaranteed by GANIL for 2013 to be completed in the 2014 request
30
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
31
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
32
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 5TC 11 Without tracking E. Farnea et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343
33
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
34
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
35
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
36
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
37
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
38
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
39
E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.