Presentation is loading. Please wait.

Presentation is loading. Please wait.

Deliverables and Milestones in WP2 D2-2 Weather Forecast on WWW (June 2002) D2-3 Signing Tutor (June 2002) M2-3 Edit-tool (Sept.2002)

Similar presentations


Presentation on theme: "Deliverables and Milestones in WP2 D2-2 Weather Forecast on WWW (June 2002) D2-3 Signing Tutor (June 2002) M2-3 Edit-tool (Sept.2002)"— Presentation transcript:

1 Deliverables and Milestones in WP2 D2-2 Weather Forecast on WWW (June 2002) D2-3 Signing Tutor (June 2002) M2-3 Edit-tool (Sept.2002)

2 D2-2 Timetable made Improvements are being made Preparations for hosting are being made

3 D2-3 (Rolf)

4 M2-3 Work group established (John G., Thomas, Margriet) 1rst task: choice of domains further steps: –IvD, UH & UEA create lexicons –UEA creates a port from translator-type of lexicon to editor-type of lexicon –IvD investigates which parts of which signs must be changeable by the user. Feasibility of sign-editing options is discussed with UEA. –UEA continues implementing the animation of HamNoSys –UEA implements basic aspects of the editing environment: an empty sign-database with HamNoSys-entering mechanism selection of sign out of database possibility to edit the retrieved HamNoSys visual feedback the possibility to store a created SL-document and to re-edit it later


Download ppt "Deliverables and Milestones in WP2 D2-2 Weather Forecast on WWW (June 2002) D2-3 Signing Tutor (June 2002) M2-3 Edit-tool (Sept.2002)"

Similar presentations


Ads by Google