Download presentation
Presentation is loading. Please wait.
Published byJulianna Gould Modified over 10 years ago
1
Modification 0466 – Daily Meter Reading Simplification DMM Reads Timeline David Addison
2
Following discussions on 8 th November 2013 at Modification 0466 Workgroup Views of the group were that Equipment agnostic solution is acceptable Better understanding of timings required for discussion Shippers were required to consult regarding their use of D+1 readings Overview
3
Current Process 07.0008.0009.0010.0011.0012.0013.0014.0015.0016.0017.00 DMSP Provision MDR File Deadline Energy Calculation Provision of Energy to Gemini CV Receipt Late Reads
4
Potential To Be – For discussion purposes 07.0008.0009.0010.0011.0012.0013.0014.0015.0016.0017.00 DMSP Provision MDR File Deadline Energy Calculation Provision of Energy to Gemini CV Receipt Proposal to Remove ‘Late Read’ Potential timing for workgroup discussion. Detailed analysis is needed to confirm actual timings.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.