3 Background FWACV methodology utilised to determine daily CVs Calculated for individual relevant inputs to and outputs from a particular charging zone Based on individual determinations of CV made by gas transporters using instruments and software approved by Ofgem Letter of Approval (LOA) Ofgem to gas transporter for CVDD and software Letter of Direction (LOD) Ofgem to gas transporter - Prescribes manner and location to determine CV
4
4 Issue LOA mandates daily calibration of CVDD Since 2008 NGGD directed sites have experienced sporadic failure to initiate automatic calibration Visibility of issue recently come to light Issue lies with Ofgem approved software interface to CVDD controller Approx 10% of calibrations not initiated
5
5 Mitigation (FWACV) methodology utilised since 1997 Vast data set Showing instrument stable and no evidence of drift NGGD tasked GL Noble Denton to establish materiality Summary Study concludes no detrimental impact on determined CV No impact on LDZ energy calculations or NTS shrinkage Whilst issue needs resolving – no detriment to consumers
6
Danalyzer Daily Automated Calibration Sequence Failures Thank You