Presentation is loading. Please wait.

Presentation is loading. Please wait.

Zagreb EIONET 4-6.03.09 Towards a Shared Environmental Information System SEIS EIONET Implementation Plan Looking backward and forward.

Similar presentations


Presentation on theme: "Zagreb EIONET 4-6.03.09 Towards a Shared Environmental Information System SEIS EIONET Implementation Plan Looking backward and forward."— Presentation transcript:

1 Zagreb EIONET 4-6.03.09 Towards a Shared Environmental Information System SEIS EIONET Implementation Plan Looking backward and forward

2 Zagreb EIONET 4-6.03.09 1. Country performance improvements Priority DF Target for 2010 100% reporting performance. 2. Reportnet enhancements Further develop Reportnet (Access, Deliver, QA and present the data needed for assessments) GIS data reception / Discovery services 3. Common information base for indicators (IMS+ and CSI) Create and agree on a common European information base for comparing European and national level SoE and progress 4. SERIS upgrade Improve access to national information on SoE EEA SEIS Implementation plan 2008 (16 projects) (I)

3 Zagreb EIONET 4-6.03.09 5. Land-water-biodiversity integrated assessment Integrated assessment inputs for the EEA SOER 2010 report (Water, Land use and Biodiversity) 6. Ozone web extension Pilot to use the system for monthly summer ozone exceedance reporting. Get all the MS on board and extend the system to PM 7. Indicators and assessments GHG emissions To get access to knowledge from national assessments, to improve SOER2010 reporting. 8. Land cover data service Web service established by end 2008 EEA SEIS Implementation plan 2008 (16 projects) (II)

4 Zagreb EIONET 4-6.03.09 9. GHG data service Better access to GHG emission data (for the actual year - 1) 10. WISE data service Provide information services within WISE, enriching the current bathing water information. 11. Air quality data service Integrate the future CAFÉ Directive data flows into the EEA air data service. Review content of Airbase. 12. Effectiveness of waste policies Create a SEIS compliant reporting system for information that is of another kind (Waste data, legislation and policies) EEA SEIS Implementation plan 2008 (16 projects) (III)

5 Zagreb EIONET 4-6.03.09 13. SEIS country visits 14. Connections SEIS INSPIRE and GMES To have a common view on responsibilities and tasks including accessing and sharing of data and information 15. EEA SEIS Signals A first report in November 2008 on SEIS moving towards SOER 2010 part C 16. Water assessments – Nitrate To get access to knowledge from national water assessments of nutrients - Nitrate EEA SEIS Implementation plan 2008 (IV)

6 Zagreb EIONET 4-6.03.09 Country performance improvements priority data flows % of data reported 

7 Zagreb EIONET 4-6.03.09 Country performance improvements priority data flows 2000 - 2007 Overall 45 53 62 64 52 62 69 73

8 Zagreb EIONET 4-6.03.09 Developing a common base for indicators Strong link to SOER2010 ESTAT project Streamlining indicators Revive the Core Set Forward looking indicators

9 Zagreb EIONET 4-6.03.09 Forward-looking indicators Aim: forward-looking indicators in the regular environment assessment and reporting 2006-2008: EEA Technical Report: Catalogue of forward-looking indicators from selected sources (SEIS Forward)Catalogue of forward-looking indicators from selected sources (SEIS Forward) 51 forward-looking indicators in IMS Outlooks Criteria for quality assessment (based on the CSI criteria) Plans: Publish forward-looking indicators on the EEA web site (2009). Quality assess all indicators-EIONET consultation process Provide regular updates for selected indicators.

10 Zagreb EIONET 4-6.03.09 SERIS Upgrade New web site and guidelines launched the 16 th of December Strong link to SOER2010 Implement Google custom search service Expand SERIS to all EIONET Countries

11 Zagreb EIONET 4-6.03.09 SEIS Forward Forward-looking integrated environment assessment Models and other methodological approaches Forward-looking indicators Scenarios Institutional arrangements and capacities Overview of forward-looking studies Module on the Envirowindows website IMS Adopted versions of SERIS and IMS SERIS

12 Zagreb EIONET 4-6.03.09 SEIS Pilot Air Quality

13 Zagreb EIONET 4-6.03.09 The end of summer? Using NRT ozone data for summer ozone reporting

14 Zagreb EIONET 4-6.03.09 Ozone data coverage 2007

15 Zagreb EIONET 4-6.03.09 Ozone exceedances DG Environment has said that if countries and EEA can show that this system can be used to provide information relating to provisional ozone exceedances, then the Commission would look seriously at revising the provisional ozone exceedance reporting requirements".

16 Zagreb EIONET 4-6.03.09 Ozone data providers 2008

17 Zagreb EIONET 4-6.03.09 Near real-time particulate matter

18 Zagreb EIONET 4-6.03.09 Land cover data service Set up distributed dissemination services at national and European level Agreed data policy Prepare the GMES land monitoring services based on CLC Register of users

19 Zagreb EIONET 4-6.03.09 SEIS Pilot Bathing Water WISE data service

20 Zagreb EIONET 4-6.03.09 Bathing water More countries to deliver bathing water quality data Enhanced Eye on Earth with an improved user interface

21 Zagreb EIONET 4-6.03.09 EEA on the road... Country visits EE SE SK GR BE SF LV DE ES CZ (04/2007 – 11/2008) AT CH IT PL IE NL LT PT DK NO TR LI We are here

22 Zagreb EIONET 4-6.03.09 Organisation Support DG ENV on the preparation of the proposed legal instrument (i.e. impact assessment) (2009-2010) SEIS Eionet country visits (2009+) Coordinate in-situ component GMES, including contribution to GEOSS (2009-2011+) Prepare with Group of 4 SEIS implementation plan (2009-2010) Support the development of SEIS in the European Neighbourhood (ENP, Horizon2020) (2009-2012) EEA SEIS implementation plan 2009-13

23 Zagreb EIONET 4-6.03.09 Content European data management(2009-2013+)  European data centres air, water, land use, climate change, biodiversity Update, Complete and maintain the reporting obligations database (ROD) + analysis (2009+) Fill data gaps priority dataflows for core set of indicators (2009-2010) National/European data and information management for State and Outlook Europe’s Environment (SOER2010) and EURope’s ECosystem Assessment (EURECA) (2010-2012) EEA SEIS implementation plan 2009-13

24 Zagreb EIONET 4-6.03.09 Infrastructure and services Priority thematic services (2009+):  WISE, Clearing House Climate Change, EPRTR, Airbase, CLC Land Cover, Natura2000 Data and information management tools:  Reportnet, IMS, Inspire GEMET, SERIS (2009+) Support Inspire implementation i.e data and service sharing with Community institutions European GMES services (2009+) Further enhance EEA’s Spatial Data Infrastructure with relevant geospatial data (2009+)  Inspire Annex I and II ≤1:100.000 EEA SEIS implementation plan 2009-13

25 Zagreb EIONET 4-6.03.09 SEIS key milestones 2009 for Eionet Towards eEnvironment - Conference Prague (25-27 March)  First meeting SEIS technical Working Group Provisions of Inspire directive into force in Member States (15 May) SEIS legal proposal Go4 SEIS implementation plan + relevant key milestones 2009 for EEA: GMES /Kick off in-situ coordination project Launch data and information services 5 EEA Data centres


Download ppt "Zagreb EIONET 4-6.03.09 Towards a Shared Environmental Information System SEIS EIONET Implementation Plan Looking backward and forward."

Similar presentations


Ads by Google