Installation of new drainage systems and reshaping of “splitter” island Rushden Redevelopment 2014
2
Digging out the bank in preparation for installing a pre-cast concrete wall adjacent to the new small item recycling area Rushden Redevelopment 2014
3
Digging out the grass bank in preparation for installing the pre-cast concrete wall Rushden Redevelopment 2014
4
Concrete has been removed from the skip bays in preparation for casting the concrete retaining wall in-situ
5
Reinforced concrete broken out from the skip bays in preparation for casting the concrete retaining wall in-situ Rushden Redevelopment 2014
6
Groundworks in preparation for moving the on-site roads