Download presentation
Presentation is loading. Please wait.
Published byNestor Hayward Modified over 10 years ago
1
Primary school expansion strategy St. Mary’s RC Primary School Chair: Paul Ballatt – Head of Commissioning, Strategy and Performance Children, Schools & Families Dept.
2
Councillor Peter Walker Cabinet Member for Education London Borough of Merton
3
The Challenge Between 2007/8 and 2013/14 there will be a growth in the number of primary school children aged 4 of 30% - 800+
4
3 Key factors for expansion strategy Building on excellent education Sustainable solutions for our schools Value for money
5
Result of Borough wide consultation autumn 2010 7 Schools including St. Mary’s RC agreed to provide extra reception classes in September 2011 and consider permanent expansion Council budget in March agreed 4-year capital sums for primary school expansion programme
6
Tom Procter Manager of Contracts and School Organisation, Children, Schools & Families Dept.
7
Aim Rationale for why proposing expansion of St. Mary’s RC Legal process School’s vision for expansion Building feasibility and phasing strategy
8
Year children will enter reception class Corresponding Birth figure Rise from 2007/08 Extra classes (FE – form of entry) 2007/082,612 2008/092,785173 3FE 2009/102,893281 3FE 2010/112,972360 3FE 2011/123,250638 7FE 2012/133,320708 2FE 2013/143,419807 3FE Birth rate increase = additional primary school places
9
Why St. Mary’s? - Overall criteria in selecting schools Educational standards – good & outstanding schools Parental preference - popular and over-subscribed schools Smaller schools expand where feasible Location – where places most in demand Physical constraints of existing school sites Value for money and affordability Balance of faith based schools
10
Legal process for St. Mary’s RC Decision made Extra reception class in September 2011 This consultation on permanent expansion from September 2012 Statutory consultation to 11 May > Consider > Publish a statutory notice > Decision > Statutory duty to implement Decision is after planning permission granted for building or “subject to planning permission”
11
Sarah Crouch Headteacher, St. Mary’s School School vision for expansion
12
To be the best that we can be More space Places for Catholic children More resources One school, One building Increased sense of community Better teaching opportunities What can we gain?
13
To be the best that we can be Ethos Playground space The way all children integrate Calm learning environment Facilities e.g. ICT suite What we don’t want to lose.
14
Building project
15
Existing site and surrounding
16
Building project Value for money for short term and long term solutions Short term – extra reception class Longer term – school gradually providing for 7 extra classes (210 pupils) from 2011/12 to 2017/18
17
Feasibility study – key questions Council building used in the short term? Council building used or demolished in longer term? Feasible to connect to existing school building? School improvement/value for money/affordability
18
Feasibility study – priorities for school Additional 7 classrooms 2 nd hall/larger hall for assemblies Early years play Whole school play/PE Appropriate ICT facilities Appropriate staff facilities
19
Existing site close up
20
Phase 2 – By Sep 2012 Phase 3 – By Sep 2014 Phase 1 – ground floor of building for 2 classrooms until summer 2014 at latest Phase 3 – Building demolished for play space by Sep 2014 Phase 1 – staff car park becomes playground Building Expansion strategy – DRAFT feasibility layouts Note – this is a draft indicative layout from the feasibility study – not a final layout plan
21
What questions do we have for the council? What happens if the budget is not available? Timing-if the two classes are not ready for September, what happens? How would this be funded? Why are we not building two new Reception classes straight away? How much say do we have on details and how much say do we have on bigger picture decisions? Can we say no? Are there enough children? What will the length of the building programme be? Will the council give a guarantee to complete the chosen option? Is there adequate funding for heating, lighting and resources? Why are we not having a prefab classroom rather than the social services building? Will we have foundations that can take an extra storey? Is the social services building structurally sound? Is it possible for parents to meet with the building team? How are the Council going to communicate once everything starts? Will we get to retain any budget surplus? How will noise disruption affect children? When will the Council decide which option to go with? Eco friendly build? Solar panels? What did the Council learn from expanding Holy Trinity?
23
Agreed reception class expansions 21 FE total - 630 extra reception places in 6 years) Year Forms of entry (FE) increase Schools 2008/09 3FE Wimbledon Chase, Holy Trinity and St. Thomas of Canterbury RC 2009/10 3FE Benedict, Hollymount and Joseph Hood 2010/11 3FE Bishop Gilpin CE (1 yr), Aragon and Cranmer 2011/12 7FE All Saints CE, Gorringe Park, Liberty, St. Marys RC, Singlegate, William Morris and Wimbledon Park, Plus 2012/13 2FE Dundonald? & one to confirm 2013/14 3FE To confirm
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.