Download presentation
Presentation is loading. Please wait.
Published byKole Sandoval Modified over 10 years ago
1
Federal Aviation Administration Radiant Panel Updates 2014 June Materials Meeting Switzerland Materials Working Group Michael Burns, FAA Tech Center June, 2014
2
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 AGENDA Radiant Panel Updates Task Group Progress Test Method / Supplement / AC Development of New Appendix Summary / Future Work
3
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 RADIANT PANEL TASK GRUP DATETASK 4/1/14Chapter RPI (Rev.1) – Request for comments 4/7/14Working Draft AC (Rev.1) – Request for comments 4/25/14Comment Period End (Rev.1) 4/30/14Draft Appendix (Rev.1) – Request for comments 5/7/14Chapter RPI and Working Draft AC (Rev.2) – Request for comments 5/30/14Comment Period End (Rev.2)
4
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 Chapter RPI SectionDescription 1Scope 2Definitions 3Test Apparatus 4Instrumentation 5Test Specimens 6Calibration 7Material Testing 8Reporting 9Requirements
5
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 DEFINITIONS Ignition Time (15 or 30 Second Option) Flame Profile (Pilot Burner) Zero Position (Coordinates Defined) Flame Propagation (Improved Definition) After-Flame Time Radiant Heat Source Thermal/Acoustic Insulation Test Series (Period between Calibration and Recheck) NIST (NIST Traceability) Heat Flux Density Chapter RPI
6
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 TEST APPARATUS Test Chamber Draft Check Electric Radiant Heat Source and Placement Specimen Holding System (Sliding Platform) Specimen Retaining Frames (Standard / Hook and Loop) Pilot Burner (Zero Position) Chamber Temperature Thermocouple (Position and Operating Parameters) Calibration Assembly (Heat Flux Gauge and Calibration Fixture) Note: Previous Figure Moved to AC Chapter RPI
7
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 INSTRUMENTATION Data Acquisition (NIST Traceability) Timing Device (NIST Traceability) Ruler TEST SPECIMENS Number of Specimens (Minimum of 3) Specimen Conditioning 70 ± 5º F (21 ± 2º C) and 55 ± 10% relative humidity Specimen Construction Rigid / Non-Rigid Materials Tape (Test Method Moved From AC) Hook and Loop (Test Method Moved From AC) Damping Systems (Test Method Moved From AC) Chapter RPI
8
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 CALIBRATION Zero Position Calibration (7 Steps) System Upset Check (8 Steps) 3-Position Check (6 Steps) MATERIAL TESTING (9 Steps) System Recheck Procedure (8 Steps) REPORTING Setpoint of Temperature for Radiant Panel Power Controller Zero Position Calibration Chamber Temperature Chapter RPI
9
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 REPORT (Continued) System Recheck Material Identification Ignition Time (15 or 30 seconds) After-Flame Flame Propagation Notes/Comments Pass/Fail REQUIREMENTS Quantity of Samples (80% or greater) After-Flame (≤ 3 seconds) Flame Propagation (≤ 2 inches) Chapter RPI
10
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 Chapter RPI Appendix Test Chamber Thermal Ceramics Inc., GA Kaowool™ M board and Superwool 607 board Gray Glass, N.Y. High temperature glass viewing window(s) - Pyroceram II Electric Radiant Heat Source Power Modules Inc., PA EZ-Zone Temperature Controller Electrical Radiant Heat Panel Din-a-Mite Power Controller Bayonet Type Thermocouple (Electrical panel operating temperature)
11
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 Chapter RPI Appendix Pilot Burner Marlin Engineering, Inc., WA Supply Tube Assembly (Formed and Straight Tubing) Nozzle Assembly Nozzle Extension Flame Length Indicator Chamber Temperature Thermocouple Omega Engineering, Inc. CT (One of many options) Heat Flux Gauge (HFG) Gardon Heat Flux Gauge (With/without mounting flange) Vatell Corporation, VA Medtherm Corporation, AL
12
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 2014 Radiant Panel Round Robin It’s that time again! Request for Participants Looking to begin shipping samples by mid July (Results Presented at the Fall Meeting) Task Group Input Request: Are there any problems that need to be addressed? What should be evaluated?
13
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 Future Work Review / Include Task Group Comments (Rev.2) Chapter RPI / Appendix / AC placeholder documents Include Standardized Test Data Sheet in Chapter RPI 2014 Round Robin
14
Federal Aviation Administration Radiant Panel Test Apparatus June 2014 Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.