Download presentation
Presentation is loading. Please wait.
Published byShawn Elwell Modified over 10 years ago
1
Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review
2
House Wharf Road after 1906 earthquake
3
House 1939 with stairs to lookout
4
Plan of lot as purchased in 1955 (note: stairs leading up hillside)
5
2005
6
House Old quarters building with wing wall additions from 1964
7
Front view of main house and lab
8
Salt water concrete holding tank added in 1964
9
mm Feeds to tank – water cannot be dumped back into bay
10
Back door to house
11
Back entrance to cellar
12
East face where 1964 stairs were removed
13
Fence and concrete buttress wall at rear of main house
14
Front steps
15
Deterioration at front step post
16
First Floor Plan
17
Stove in kitchen
18
Kitchen
19
Second floor plan
20
Front office area Second floor
21
Second floor
24
Back office area Second floor
25
Attic space
26
Biology Lab floor plan
27
Exterior of west face of lab (old Coast Guard Boat House)
28
Exterior of lab building
29
Entrance to lab
30
Lab interior
31
Typical storage
32
Wet table
35
Storage shed floor plan
36
Workshop
37
Dock at low tide
38
View to Kent Island
39
Questions & Answers
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.