Presentation is loading. Please wait.

Presentation is loading. Please wait.

By: James Chaney.  The topic for my project was making D day in minecraft. In the presentation there will be Work Repots, Work Reports Cont., Work Plan.

Similar presentations


Presentation on theme: "By: James Chaney.  The topic for my project was making D day in minecraft. In the presentation there will be Work Repots, Work Reports Cont., Work Plan."— Presentation transcript:

1 By: James Chaney

2  The topic for my project was making D day in minecraft. In the presentation there will be Work Repots, Work Reports Cont., Work Plan Cont. Cont., Conclusions and Questions.

3  I never had to have meetings or assignments because I was working alone the whole time.  Lots of experiments like redstone and setting up commands had to be made while working on this.  I had a couple changes in the process including setting up the redstone (helped me set up the scenes) and the plot.

4  Feedback was very little though out the project because some people wouldn’t put feedback on my page even after I asked them to. (I'm not saying any names) but I got enough from lee to know that I needed to change some things.  Documentation was with videos using camtasia and recording the screen. We will watch my last one next slide.

5 http://www.engagemc.wikis.birmingham.k12.mi.us/Ja mesCE6

6  Research was really quick because I had to start working on my world but the links for it are on the wiki.  Effort was about 80% because sometimes I got distracted by something else (being honest here) Schedule: Fri 5/31: Final playthough and check everything for bugs. Thurs 5/30: Start putting gear for map in chests and continue playing though the map. Tues 5/28: Finish up any bugs and start playing though map to check for any problems. Fri. 5/24: Finish redstone. Thurs. 5/23: Redstone Tues. 5/21: Continue redstone Fri. 5/17: Finish up building and start moving on to redstone. Thurs: 5/16: Continue Building ships and etc. Tues: 5/14: Continue building ships and etc. Friday: 5/10: Continue building ships and etc. Thurs: 5/9: Start building ships, airplanes, and other stuff. Tues: 5/5: Finish story boards and documenting different beaches to place story on. Friday 5/3: Research and document and start writing story boards. Note: Research landing grounds for D day.

7  The project was successful because I finished it and it had no bugs and nothing wrong with it.  The only way I would make it differently is the shape of the ships because, they look weird and out of sorts.

8 Any questions? (By the way I will not show the map unless we can set up the Mac that I used to the wiki)


Download ppt "By: James Chaney.  The topic for my project was making D day in minecraft. In the presentation there will be Work Repots, Work Reports Cont., Work Plan."

Similar presentations


Ads by Google