Common Permit by Rule Authorizations in Texas
Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014
2
Permit by Rule 106.A3168 Alchemy
Definition - the ability to transform base metals into the noble metals (gold or silver) This slide contains complete nonsense.
3
Alchemy This slide contains complete nonsense.
4
Permit by Rule 106.A3168 Alchemy
Rule language – Equipment and facilities used for the process of alchemy is permitted by rule. This slide contains complete nonsense.
5
Today’s Topics General Information About Using PBRs Most Common PBRs
What to Include in the Application New Processes PBRs = permits by rule
6
Using a PBR Quicker response time Lower fees
Pros Other Considerations No circumvention No partial permitting No customization Lower fees Faster response time Quicker response time Lower fees Cannot customize – all or nothing Cannot partially permit a process Cannot circumvent permitting PBRs can be found in Title 30 of the Texas Administrative Code, Chapter 106. Meetings with Rule and Registrations (R&R) staff prior to submittals is encouraged if using PBR(s) at major sites.
7
Using a PBR Claiming vs. Registering Certification vs. Registration
Claiming – Keep records to show compliance with all rules and regulations Registering – Submitting documentation to TCEQ and paying a fee Certification vs. Registration PI-7 PI-7CERT or APD-CERT PI-7 = Registration for Permits by Rule (form) PI-7CERT = Registration and Certification for Permits by Rule (form) APD-CERT = Certification of Emission Limits (form) Some PBRs will require registration, others can simply be claimed.
8
Most Common PBRs §106.433 – Surface Coating
§ – Dry Abrasive Cleaning § /262 – Facilities 470 series – Tanks, Loading, Storage 140 Series – Aggregate & Pavement §§ , 359, 492, 512 – Oil and Gas
9
Surface Coating
10
§106.433 Enclosed vs. non-enclosed surface coating
13 tpy VOC vs. 25 tpy VOC Exempt solvents Process MSS vs. non-process MSS tpy = tons per year VOC = volatile organic compound MSS = maintenance, start-up, and shutdown
11
§106.433 MSDS: technical and air quality data Calculations
Surface Coating Facilities Guide Calculation Spreadsheet for Estimating Emissions Chapter 115, Federal Standards, MSS MSDS = Material Safety Data Sheet The surface coating guide can be found at The surface coating spreadsheet can be found at
12
Dry Abrasive Cleaning
13
§106.452 Enclosed vs. non-enclosed Blast media Distance limits
Usage limits MSS PBR § typically goes hand-in-hand with PBR § As applicable, MSS may also be authorized under PBR §
14
Facilities
15
§106.261 and §106.262 Only use when there is not a more specific rule
Account for all upstream/downstream impacts MSS Represent all associated NSR Permits Certify major sites NSR = New Source Review If you cannot meet a section of another more appropriate PBR, you cannot use PBRs § or § instead. These PBRs are not intended to be substitutes for rules that have technical requirements that cannot be met. All upstream and downstream impacts must be addressed and accounted for when using 261/262 to add new equipment to an existing process. Questions to consider are: Is the throughput changing? Will there be new chemicals introduced with this new process that will have to be addressed in facilities downstream?
16
§ and § Common Issues Can you use current version of TLV? Annual submittal Easier, cheaper when prepared all together We allow “portable” annual notifications if each site < 5 tpy TLV = Threshold Limit Value The rule requires the use of the time weighted average (TWA) Threshold Limit Value (TLV) published by the American Conference of Governmental Industrial Hygienists (ACGIH), in its TLVs and BEIs guide (1997 Edition). However, if a newer TLV has a more stringent value OR if a chemical is listed on the current version, but was not in the 1997 version, we highly recommend you use the newer value to ensure protectiveness. You can use the current version of the TLV only when the current version is equal to or more stringent than the 1997 version. NOTE: break out each project to make sure Prevention of Significant Deterioration, Nonattainment, etc. were never triggered.
17
§106.261 and §106.262 Limits 6 lb/hr & 10 tpy 1 lb/hr & 4.38 tpy E=L/K
Net increase on new hour Netting Is it okay to exceed permitted allowable? lb/hr = pound per hour E = maximum allowable hourly emission, and never to exceed 6 lb/hr L = value as listed or referenced in Table 262 of Chapter 106 K = pre-determined value from Figure 1: 30 TAC § (a)(2) of Chapter 106 and based on distance to the nearest off-property receptor Can you use 261/262 to increase a permit allowable? Yes, if the NSR permit does not prohibit it and you can meet the appropriate limits of 261/262.
18
Tanks, Storage, and Loading
470 series of PBRs
19
§106.470 - §106.478 Authorizes: Is “tank memo” still in effect?
New construction New service of existing tank Change of service Is “tank memo” still in effect? Using PBRs § and § The “Storage Tank Construction Under Permit by Rule” memo can be found at Per the Memo: PBRs §§ may be claimed to authorize handling of chemicals not considered or excluded from PBRs §§ while construction of the tank will be authorized under PBRs §§ PBRs §§ cannot be used to circumvent control, distance, or registration requirements in PBRs §§
20
Aggregate & Pavement 140 series of PBRs
21
§106.141- §106.150 Calculations: AP-42 and throughput Using engines?
PM10 limit = 15 tpy PM2.5 limit = 10 tpy Include a project description PM10 = particulate matter equal to or less than 10 microns in diameter PM2.5 = particulate matter equal to or less than 2.5 microns in diameter AP-42 can be found at §106.4(a)(4) can be found at
22
§106.141- §106.150 MSS: process vs. non-process Include a plot plan
RFC (site review) required Distance limitations RFC = Request for Comments
23
Oil and Gas Sites
24
Oil and Gas §106.352 - Oil and Gas Handling and Production Facilities
§ Flares § Stationary Engines and Turbines § Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities
25
PBR Options – Location Not in Barnett Shale counties
New – 30 TAC § (a)-(k) Existing – 30 TAC § (l) Not in Barnett Shale counties New & existing – 30 TAC § (l) May voluntarily register under § (a)-(k) 30 TAC = Title 30 Texas Administrative Code Projects constructed/modified on or after April 1, 2011 are considered “new.”
26
Barnett Shale Counties
The PBR for oil and gas handling and production facilities has different requirements based on location of the site and the date of construction/modification. The Railroad Commission (RRC) includes counties in their list of Barnett Shale Formation Counties that are not considered as part of this rule.
27
§106.352(l) §106.352 (l) Sweet: Sour (> 24 ppm H2S):
No registration required, meet §106.4 limits, and keep records Sour (> 24 ppm H2S): Registration required ¼ mile distance limit, 4.0 lb/hr limit of sulfur compounds, vent height requirements ppm = parts per million H2S = hydrogen sulfide lb/hr = pounds per hour While not numerically first, § (l) is the most commonly used OGS PBR so we will discuss this first. (l) The requirements in this subsection are applicable to new and modified facilities except those specified in subsection (a)(1) of this section. Any oil or gas production facility, carbon dioxide separation facility, or oil or gas pipeline facility consisting of one or more tanks, separators, dehydration units, free water knockouts, gunbarrels, heater treaters, natural gas liquids recovery units, or gas sweetening and other gas conditioning facilities, including sulfur recovery units at facilities conditioning produced gas containing less than two long tons per day of sulfur compounds as sulfur are permitted by rule, provided that the following conditions of this subsection are met. This subsection applies only to those facilities named, which handle gases and liquids associated with the production, conditioning, processing, and pipeline transfer of fluids found in geologic formations beneath the earth's surface. NOTE: TCEQ definition of sour is 24 ppm. The RRC definition of sour is 100 ppm.
28
§ (a-k) § (a-k) Notification and registration through ePermits system Notification - Prior to construction or implementation of changes Registration Level 1 - Within 180 days from start of operation Level 2 - Within 90 days from start of operation ESL = effects screening level NAAQS = National Ambient Air Quality Standards H2S = hydrogen sulfide SO2 = sulfur dioxide NO2 = nitrogen dioxide NOX = nitrogen oxides E-Notify prior to construction or implementation of changes Level 1 PBR register within 180 days from start of operation or implementation of changes Level 2 PBR register within 90 days from start of operation or implementation of changes Contaminants That Require Impacts Evaluation: Benzene short-term ESL= 170 µg/m3, long-term ESL= 4.5 µg/m3 H2S NAAQS = 108 µg/m3 SO2 NAAQS = 196 µg/m3 NO2 NAAQS = 188 µg/m3 Evaluation Thresholds in lb/hr: Benzene = 0.039 H2S = 0.025 SO2 = 2 NOX = 4 No impacts review necessary for a given contaminant if the lb/hr emissions are below what is stated in the slide. No ESL review (for benzene) required if no receptor within specified distance of registration. No ambient air quality standard review (for NO2, SO2, and H2S) required if no property line within specified distance of registration. 1/4 mile - PBR Level 1 1/2 mile - PBR Level 2 1 mile - Standard Permit
29
§ and § § May be used in combination with § (l) May require certification § May be used in combination with § (l) Requires registration if > 240 hp hp = horsepower A flare could require certification if it is being used to limit emissions for Title V Applicability. An engine could require certification if it has been equipped with a catalyst in order to comply with a federal standard.
30
Submitting the Application
So you want to use one of our popular PBRs. Now what?
31
Application Admin. Documents Preferred Order
Cover letter Core Data Form PI-7, PI-7-CERT, APD-CERT Copy of check or ePay voucher There is a “Fact Sheet – Tips for a Speedy Administrative Review,” which can be found at
32
When Do I Need to Certify?
Emission limitations for Title V applicability Federal applicability Control/destruction efficiency claims Operating hours The most common reasons companies voluntarily certify or are asked to certify a project by a permit reviewer are to: Set emissions limits so as not to trigger Title V applicability. Demonstrate compliance with or exemption from federal applicability. Certify the control or destruction efficiency claims being made. An example of this could be if you are controlling your tanks with a flare that has a 98% destruction efficiency. You would be asked to certify to that the claimed efficiency will be met. Limit the operating hours below 8760 hours/year. An example of this could be if you were limiting the run time of a compressor to 2000 hours instead of 8760. Above is only a partial list of the most common reasons companies voluntarily certify or are asked to certify a project by a permit reviewer. The full list can be found on the PI-7-CERT or APD-CERT Form(s). Prior to submitting an application, please verify a certification is not required. Failure to certify a project that requires it will only result in delays.
33
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/NAAQS Applicability Lab analysis Maps Tables
34
Summary of Emissions EPN = emission point number
VOC = volatile organic compound NOX = nitrogen oxides CO = carbon monoxide PM10 = particulate matter equal to or less than 10 microns in diameter PM2.5 = particulate matter equal to or less than 2.5 microns in diameter SO2 = sulfur dioxide
35
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/NAAQS Applicability Lab analysis Maps Tables In addition to the introduction, process and flow diagram, and summary of emissions, the next items needed in the application (in preferred order) are: emission calculations, the impact analysis/NAAQS, demonstration of meeting the rules that are being applied for, and the lab analysis.
36
Lab Analysis Site Specific/Representative
Guidance at Three criteria Reservoir/formation API gravity Process/treatment API = American Petroleum Institute The § webpage can be found at
37
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/ NAAQS Applicability Lab analysis Maps Tables The last two items (in preferred order) for the technical application include maps and tables.
38
New Processes and Changes
39
Enhanced Application Review (E.A.R.)
Purpose notification Expectations Approval letter will be sent through unless specified otherwise. The will ask : If the company has already completed the project. If the company is waiting for a response before it starts construction. If there are any updates to the application you/the company would like to submit before it is assigned to a reviewer. If you/the company would like a hard copy mailed to you.
40
Auto Deficiency Begins 6/1/2014: All Applications Oil & Gas Specific
Emissions Summary Table Gas and liquid analysis Emission calculations/ documentation Sour site < ¼ mile (for § (l) only) RO signature matches (certifications only) Flash calculations Response to a VOID and not all issues addressed NOX NAAQS compliance (§ only) Justification for DRE above default allowables RO = responsible official NOX = nitrogen oxides NAAQS = National Ambient Air Quality Standards DRE = destruction removal efficiency If the application should include any of the information in the table, and it is not included – the project will be VOIDED and a VOID LETTER will automatically be sent out via AIROG. With this new change, it is very important that the pages in your application are clearly labeled and that you include an accurate table of contents.
41
Air Permits main line: (512) 239-1250
Questions? The address for oil and gas issues is The Air Permits Division can be reached by telephone at (512) Air Permits main line: (512)