Download presentation
Presentation is loading. Please wait.
Published byKeon Blades Modified over 10 years ago
1
INFOMØTE 22.MARS INNFØRING AV ASAP NYTT VFR MØNSTER RY
2
7. April 2011
3
Oslo ASAP AIRSPACE Operational objectives: Oslo ASAP is intended to develop a new airspace structure within the Oslo AoR, including SIDs and STARs for Oslo and Farris TMA. Ensure adequate capacity in Oslo and Farris TMAs and in Oslo ACC while keeping: –Safety at a high standard; –Controllers’ workload at an acceptable level. Ensure efficiency of operations so as to: –Reduce CO2 emission; –Accommodate Noise Abatement Procedures (ENGM).
4
Proposed Sectors and Positions OSLO and Farris TMAs APP WEST APP EAST FIN DIR (DIRW / DIRE) FARRIS WEST FARRIS EAST Sectorisation ACC S1 S2 S3 S4 S5 S6 S7 S8 (FARRIS) 124,35 134,05
5
Principles of Point Merge
8
FL100 FL110 FL120
9
TMA Holdings
10
ENTO RWY 36
11
ENRY RWY 30
12
ENRY RWY 12
13
BUKTEN SALTNES MAX 1000 MAX 1500 MAX 1500 BEVØYA 592941N 0103745E TOR R 030 22,5NM 592702N 0105116E TOR R 047 24,7NM 591740N 0104458N TOR R 063 16,7 NM
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.