Download presentation
Presentation is loading. Please wait.
Published byMelinda Blush Modified over 10 years ago
1
1 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 1 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd NJHQ Norwegian Joint Headquarters 2014-03-05 Monterey Cdr S.G. Atle Selvaer, J7 CAX Manager
2
2 Name of unit must never exceed two lines Ref: for example project title / unit / yyyy.mm.dd 2 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd AIM Inform about the Norwegian use of JTLS
3
3 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd Permanent CAX organisation Background: NJHQ were tasked to establish a national CAX capability in 2009 CAX is recognised as a costeffective way to do Command Post Exercises A study came to the conclusion that this organisation needed a minimum of 7 specialists As of now I am the only one. (3 more accepted in near future) Beeing helped by R&A and NCI Agency Educating JTLS operators every year (building a pool)
4
4 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd CAX in support of CPX JTLS & JEMM as CAX tools Stimulation of ”live” C2 systems Integrated part of EXCON Partners Advantages of CAX
5
5 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd CAX JEMM
6
6 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd Operation Area
7
7 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd EXCON during Gram exercises EXCON HICONSITCEN MEL/MIL EV MAN IEV MAN IIEV MAN IIIEV MAN IV SIMCON LOCON LANDAIR SOFMARITIME LOGCIS INFO OPS GREY CELL MEDIA SCENARIO SITFOR INTEL EVAL
8
8 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd SIMCON CAX manager DB-managerTech. control CAX mentor LOCON Responsecell Planners Battle captain CAX operator (10) CAXmentor (3) MEL-MIL COORD LAND MAR AIR SOF LOG
9
9 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd SITFOR Planners CAX operator (4) CAXmentor LAND/SOF MAR AIR CIV Movement/SOF
10
10 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd Manning Primary Training Audience is the Norwegian Joint Hq and the Tactical Command Hq’s Tactical Commands: TLC (Tactical Land Command) CTG 430.01 (Maritime) CTG 430.02 (SubOp Auth) NAOC (National Air Ops Centre) SOFC NLC (National Logistics Command) CYFOR SIMCON: Total of 30 2-3 Tech Control from R&A + 1 Tech Control from NCI Agency 5 specialists/Mentors from NCI Agency 1 Cax Manager NJHQ 1 Database Manager NDRE (Norwegian Defence & Research Establishment) 2-3 CIS Tech Support (local) 1-2 NEC CCIS Specialists (Air Tasking Interface issues) 14 JTLS Operators
11
11 Norwegian Joint Headquarters Ref: for example project title / unit / yyyy.mm.dd Ambitions 2014 – 20xx Database development for several exercises, Table Tops Educate/enable CAX org. For JTLS in wargaming/Budget Based Wargaming (BBW) Participate in relevant environments for lifting competance level/LO exchange Exploit excisting Intentional Agreements with partners for mutual cooperation Evaluation and Analysis tools to be used in a systemised way Develop/design JTLS tool for Exercise Coop with Civilian Authorities Contribute to National Concept Development & Experimentation projects.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.