On the 14 th of January 2009 we visited the water conditioning plant and the sewage plant in Sulejowek.

Similar presentations


Presentation on theme: "On the 14 th of January 2009 we visited the water conditioning plant and the sewage plant in Sulejowek."— Presentation transcript:

1

2 On the 14 th of January 2009 we visited the water conditioning plant and the sewage plant in Sulejowek

3 The water plant uses ground water and supplies the inhabitants of Sulejowek with drink water

4 The water is purified with compressed water filters.

5 The retention reservoirs contain the purified water as a precaution in case of a water plant failure.

6 The retention reservoirs of the sewage plant contain wastewater after mechanical sewage treatment. During the second stage of water treatment the wastewater is purified mechanically.

7 This is the retention water reservoir after the first stage of purified treatment.

8 The modern biological reactor has capacity of 1800 cubic metres a day.

9 This is a reservoir of excessive sediment in the sewage plant.

10 A round-the-clock monitoring of water purity and water conditioning is a complicated process. The qualitative parametres of sewage water correspond with the norms defined in enviromental regulations of the EU.