Download presentation
Presentation is loading. Please wait.
Published byMason Sparks Modified over 11 years ago
1
Building Modifications and Improvements
2
Air Operated Valves Valve Training Area
3
Air Operated Valves Valve Training Area
4
Air Operated Valves Valve Training Area
5
Motor Operated Valves Valve Training Area
6
Motor Operated Valves Valve Training Area
7
Motor Operated Valves Valve Training Area
8
QSS Calibration Rig Valve Training Area
9
Spring Pack Tester Valve Training Area
10
Butterfly Valve Training Stand Valve Training Area
11
Training Class Valve Training Area
12
Training Class Valve Training Area
13
Johns Employee Suggestion Box Work Area
14
Madden Gardens Employee Lunch Area
15
Before the renovations Quiklook assembly area
16
After the renovations Quiklook assembly area
17
After Renovations QA Calibration Area
18
Before and After Employee Work Bench
19
Before and After Employee Work Bench
20
We would like to invite you all back to Teledyne for a tour of our facility.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.