05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started.

Similar presentations


Presentation on theme: "05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started."— Presentation transcript:

1 05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started

2 05/07/12 – 5/13/12 Demolition at 1927 wing nearing completion

3 05/07/12 – 5/13/12 Phase 1 Air Handler Units removed

4 Field Measured Phase 3 Rotunda Completed Electrical Shutdown to relocate Main Electrical Panel Exterior Complete drilled piers Form and Pour Footings at South Side Interior Continue with MEP in 1927 Wing Prep for floor cut at main electrical room Wall off existing area at Spartan Grille to facilitate Taco Bell/C-Store Relocation During the break… NEXT WEEK LOOK AHEAD Phase 3 Rotunda Field Measurement and Verification 05/07/12 – 5/13/12


Download ppt "05/07/12 – 5/13/12 Phase 1 Demolition at West Entry Complete; Drilled Piers and footers Started."