1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN 09.08.2011
2
2 The goal of design: To provide maintenance and services works of EB / EE / ES / HB / PP1 / PIXEL / TK (from Tracker Bulkhead to 11m); To provide maintenance and services works of EB / EE / ES / HB / PP1 / PIXEL / TK (from Tracker Bulkhead to 11m); To provide safe access to all central subdetectors; To provide safe access to all central subdetectors; The set tooling & radiation shielding should provide full compatibilities with all activities; The set tooling & radiation shielding should provide full compatibilities with all activities; We try to use present equipment from P5 (main platform, “gasprom” platform, yellow structures, EB platform with “enfourneur” We try to use present equipment from P5 (main platform, “gasprom” platform, yellow structures, EB platform with “enfourneur”
3
3
4
4 EB MAINTENANCE (super module reinstallation)
5
5 EB PLATFORM MODIFICATION
6
6 EB TOOLING INSTALLATION
7
7 EB platform/VT cable treys conflict
8
8 EB platform/VT cable trays conflict
9
9 EB SUPER MODULE REINSTALLATION
10
10
11
11 TK/BP shielding interface
12
12 Bulkhead & BP shielding
13
13 Shielding support fix onto PP1
14
14 Shielding support fix onto PP1
15
15 BP & forward shielding
16
16 BP shielding in open position
17
17 Radiation shielding & supports system (EB/HB/ES/EE maintenance)
18
18 Bulkhead shielding & support installation onto PP1
19
19 Shielding/BP interface
20
20 Front shielding disk with support installation
21
21 Tooling for support & shielding installation
22
22
23
23
24
24 Temporary bar installation
25
25 Temporary bar removed
26
26 Shielding support installation onto PP1
27
27 Shielding support installation onto PP1
28
28 Stair-platform & special scaffolding compatibility
29
29 Star-platform & special scaffolding compatibility
30
30 Winch system for counter weight stroke
31
31 Tooling for Support & shielding installation
32
32 Counterweight remove
33
33 BP shielding installation
34
34 BP shielding installation (step by step)
35
35 Back shielding installation
36
36 BP temporary support installation
37
37 Shield seismic load stabilization
38
38 Shield seismic load stabilization
39
39 HB/EB/ES/EE maintenance
40
40 HB/TK/PP1 zone maintenance
41
41 Radiation shielding & supports system (EB/HB/PP1 maintenance)
42
42 BP shielding installation
43
43
44
44 PIXEL/ES/EE maintenance
45
45 PIXEL REINSTALLATION (LAYOUT)