Download presentation
Presentation is loading. Please wait.
Published byBrett Cardwell Modified over 10 years ago
1
The Trouble of Water Floods in Changjiang Basin - Causes - Effects - Solutions Droughts in Huanghe Basin - Causes - Effects - SolutionsSolutions
2
Droughts in Huanghe Basin - Solution Huang He Multi-purpose Water Scheme South to North Water Transfer Project 1. Eastern routeEastern route 2. Middle routeMiddle route 3. Western routeWestern route
3
Map of South to North Water Transfer Project 1 2 3 Western Route Middle Route Eastern Route Chang Jiang Huang He
4
Eastern route (2002-2007) Lower course of Chang Jiang Yangzhou Export to Tianjin and Shandong For industry+Urban water consumption Lower water quality – passing Beijing-Hangzhou Canal Huang He-crossing project (tunnel) Water treatment projects
5
Middle route (2003-2010) Middle course of Chang Jiang Han Jiang – Danjiangkou Reservoir Export to Beijing and Tianjin For agriculture+industry+Urban water consumption Higher water quality parallel Jing-Guang Railway Huang He-crossing project (tunnel) Danjiangkou Reservoir project
6
Western route (2010-2050) Upper course of Chang Jiang Three routes: 1. Yalong Jiang - Huang He 2. Dadu He - Huang He 3. Tongtian He - Yalong Jiang Water supply to NW provinces Dams+pumping stations+tunnels
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.