PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II
2
Concerns 1.) Multiple Outage congestion 2.) Upcoming Outages
3.) PSA solutions
3
NI S>N 60F anticipated outage combination for 9/11/2007 Study 226
Tacoma - Raver #1&2 500kV, Monroe-Custer #1 500kV, Sedro - Bothell - Horse Ranch 230kV, Tacoma - Cowlitz #2 230kV, Snohomish 230/115kV Bank#3 & March Point 230/115kV Bank #3 O/S (S>N (Snohomish Delta Sep scheme enabled: DeltaSw - TualiPt & DeltaSw - C Mary St. 115kV O/S) Study 226 NI S>N 60F
4
Contingencies Average Puget Sound Net Area Load = 4675 Gen Level Trans
Average Puget Sound Net Area Load = 4675 Gen Level Trans Worst Limiting PSE SCL/ Limit Contingency Facility SNOH 100 140 -141 BFR: 4494 Cust-Mon #2 500kV & Cust 500/230kV Bk#1 Branch MURRAY (40767) TO SNOH S1 (41327) CKT 1 [ kV] 460 -143 775 -149 BFR: 4496 Cust-Mon #2 & Cust 500/230kV Bk#2 260 21 20 13 525 896 BFR: Snohomish 230kV Bus Sect #1 Branch BUNKFOSS (45613) TO SNOH S1 (40984) CKT 1 [ kV] 852 799 N-1: Snohomish - Murray #1 230kV 1000 1556 1512 1463 1200 1529 N-2: Murr - Cust #1 & Belling - Cust #1 230kV Branch CUSTER W (40321) TO PORTALWY (42001) CKT 1 [ kV] 1468 1409
5
226 vs. ALIS NI S>N 60F
6
Major upcoming outages
Sedro-Bothell-Horse Ranch 230kV Chief Joseph – Monroe 500kV Bothell – SnoKing #1 230kV Rocky Reach – Maple Valley 230kV Monroe 500/230kV Bank #1 Grand Coulee – Schultz #1 500kV Schultz – Raver & Schultz – Echo Lake 500kV
7
To think about…. Multiple facilities in same area
Does the facility have major impacts Ways of implementing mitigation plans Responsibility of mitigation plan? Operation vs. planning arena Agreeing on feasible solutions
8
Questions?