Presentation is loading. Please wait.

Presentation is loading. Please wait.

DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.

Similar presentations


Presentation on theme: "DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard."— Presentation transcript:

1

2 DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard

3 Mark W. CramptonDistrict Engineer John HuchrowskiAssistant District Engineer - Construction Sue PalmerAssistant District Engineer - Maintenance

4 Westminster Shop Storage Facility $0 - $100,000 EST AD12/01/14 EST BID12/01/14 EST NTP12/01/14

5 Geometric Improvements - MD 140 at Pleasant Valley Road $2,500,001 - $5,000,000 EST AD01/06/15 EST BID02/12/15 EST NTP04/20/15

6 Widen and Resurface – MD 26 Emerald Lane to Calvert Way $2,500,001 - $5,000,000 EST AD12/15/15 EST BID01/21/16 EST NTP03/28/16

7 Widen and Resurface – MD 27 at Center Street $500,001 - $1,000,000 EST AD10/27/15 EST BID12/03/15 EST NTP02/08/16

8 Community Safety & Enhancement – MD30BU North Woods Trail to CSX $15,000,001 - $30,000,000 EST AD11/24/15 EST BID01/07/16 EST NTP03/07/16

9 Geometric Improvement – MD 32 at MD 97 $1,000,001 - $2,500,000 EST AD02/10/15 EST BID03/19/15 EST NTP05/25/15

10 Geometric Improvements – US140EB at Kays Mill Road $100,001 - $500,000 EST AD01/20/15 EST BID02/26/15 EST NTP05/04/15

11 Clean and Paint Bridges – Frederick County $1,000,001 – $2,500,000 EST AD10/28/14 EST BID12/04/14 EST NTP02/09/15

12 Interchange Construction – US 15 Monocacy Blvd. Interchange $30,000,001 – $50,000,000 EST AD11/04/14 EST BID12/11/14 EST NTP02/16/15

13 Geometric Improvement – US15NB Motter to MD 26 $1,000,001 – $2,500,000 EST AD01/06/15 EST BID02/12/15 EST NTP04/20/15

14 Bridge Replacement – MD75 Over Haines Branch $1,000,001 – $2,500,000 EST AD11/25/14 EST BID01/08/15 EST NTP03/16/15

15 Geometric Improvement – US40 at Baughmans Lane/Linden Ave. $100,001 – $500,000 EST AD01/27/15 EST BID03/05/15 EST NTP05/11/15

16 Wetlands Replacement – Furnace Ave. Tributary $100,001 - $500,000 EST AD10/06/15 EST BID11/12/15 EST NTP01/18/15

17 Geometric Improvements – US 40 at Rogers Ave. $1,000,001 - $2,500,000 EST AD02/03/15 EST BID03/12/15 EST NTP05/18/15

18 Noise Abatement Type 2 – I-95 NB Montgomery Road to I-895 $5,000,001 - $10,000,000 EST AD05/12/15 EST BID06/18/15 EST NTP08/24/15

19


Download ppt "DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard."

Similar presentations


Ads by Google