Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078.

Similar presentations


Presentation on theme: "Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078."— Presentation transcript:

1 Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078

2 2WJM Objectives Review situation of ISO 17078.1 – Side Pocket Mandrels Specification Review situation of ISO 17078.2 – Flow control devices Review situation of ISO 17078.3 – Latches and KOT Specification Time Line

3 3WJM ISO 17078-1 ISO/WD 17078 1 Petroleum and Natural Gas Industries Down hole equipment Part 1: Side Pocket Mandrels Violators may be prosecuted.

4 4WJM Environmental Service Grade Environmental service grades Table A-1 Grade El -- Standard serviceNon-sour service Grade E2 -- Stress corrosion cracking service H 2 S (sour) service 1 Grade E3 -- CO 2 serviceCO 2 service 2 Grade E4 -- Special serviceSpecial service requirements defined by the user/purchaser Environmental service grades Characteristics ____________________ 1Per NACE MR-01-75 2There are no published international standards for CO 2 service. Each individual situation shall be evaluated on a case-by-case basis.

5 5WJM Design Verification Grade D1D2D3 DocumentationHist. RecordRequiredRequired See B.1 -- 1See B.2 -- 1See B.3 – 1 Design review (burst,RequiredRequiredRequired collapse, tolerance)See B.1 -- 2See B.2 -- 2See B.3 – 2 Burst & collapse pressureNot requiredBurst & collapseNot required test to destruction @See B.1 -- 3See B.2 -- 3See B.3 – 3 ambient temperature Pressure testing @ ratedRequiredRequiredRequired temperatureSee B.1 -- 4See B.2 -- 4See B.3 – 4 Internal pressure cyclesNot required10 cycles10 cycles See B.1 -- 5See B.2 -- 5See B.3 – 5 Finite element analysis /Not requiredNot requiredBurst & collapse strain gaugeSee B.1 – 6See B.2 -- 6See B.3 – 6 Flow control – install/pull @ 12 o'clock@ 12,3,6 o'clock@ 12,3,6 o'clock with kick-over toolSee B.1 -- 7See B.2 -- 7See B.3 – 7 Slick line operational testNot requiredNot requiredRequired with kick-over toolSee B.1 -- 8See B.2 -- 8See B.4 - 8 Table B-1

6 6WJM Product Validation Grade V1V2V3 Internal pressure test100%100%100% See C.1 -- 1See C.2 -- 1See C.3 -- 1 External pressure test0%5%100% See C.1 -- 2See C.2 -- 2See C.2 -- 2 Internal diameter drift test100%100%100% See C.1 -- 3See C.2 -- 3See C.2 -- 3 External diameter drift test100%100%100% See C.1 -- 4See C.2 -- 4See C.2 -- 4 Installation/removal method –0%5%100% kick-over toolSee C.1 -- 5See C.2 -- 5See C.2 -- 5 Table C-1

7 7WJM Quality Control Grade Q1Q2 Q3 Hardness testing100%100% 100% See D.1 -- 1 See D.2 -- 1See D.3 -- 1 Non-destructive examination Not required5%100% See D.1 -- 2 See D.2 -- 2See D.3 -- 2 For Q2, select one preferred method from the four listed methods of non-destructive testing. For Q3, radiographic examination is required. Surface magnetic particle examination. Liquid penetrant examination. Radiographic examination. Ultrasonic examination. Documentation100% coc 100% coc plus100% coc plus See D.1 -- 3 See D.2 -- 3See D.3 -- 3 Table D-1

8 8WJM ISO 17078-2 Violators may be prosecuted. ISO/WD 17078 2 Petroleum and Natural Gas Industries Down hole equipment Part 2: Flow control devices

9 9WJM Environmental Service Grade Environmental service grades Table A-1 Grade El -- Standard serviceNon-sour service Grade E2 -- Stress corrosion cracking service H 2 S (sour) service 1 Grade E3 -- CO 2 serviceCO 2 service 2 Grade E4 -- Special serviceSpecial service requirements defined by the user/purchaser Environmental service grades Characteristics ____________________ 1Per NACE MR-01-75 2There are no published international standards for CO 2 service. Each individual situation shall be evaluated on a case-by-case basis.

10 10WJM Design Verification Tests

11 11WJM Design Verification Tests

12 12WJM ISO 17078.3 Violators may be prosecuted. ISO/WD 17078 3 Petroleum and Natural Gas Industries Down hole equipment Part 3: Latches and KOTs

13 13WJM ISO 17078-3

14 14WJM ISO Gas-Lift Standard Meeting Schedule Time Line 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Meeting Topics to be Addressed No.LocationDateHostGeneral17078.117078.217078.1 1Houston, TX02/05/98CamcoOrganize ISO Gas-Lift Committee 2Houston, TX 05/04/98CamcoDraft Outline for ISO Gas-Lift Standard Document 3Houston, TX 05/10/99Shell Review Plan for ISO Gas-Lift Documents 4Houston, TX 11/15/99Shell Review Plan for ISO Gas-Lift Documents 5Houston, TX 03/01/00ShellReview Plan for ISO Gas-Lift Documents 6Houston, TX 05/02/00ShellReview Plan for ISO Gas-Lift Documents 7Atlanta, GA07/25/00Decker TechReview ISO 17078.1 Clauses 3 - 5 8Dallas, TX10/06/00Decker TechReview ISO 17078.1 Clauses 6 & 7 9Houston, TX 02/08-09/01WeatherfordReview Entire ISO 17078.1 10Houston, TX 05/22-24/01SchlumbergerComplete (Almost) ISO 17078.1, Begin Work on ISO 17078.2 11Houston, TX 07/18/01Chevron Complete 1 st Draft of ISO 17078.1 for WG #4 Review 12Austin, TX09/04/01OACPrepare 1 st Draft of ISO 17078.1 for Delivery to WG #4 13Austin, TX10/08-09/01Univ. of Texas Review 1st Draft of ISO 17078.2 14Aberdeen, UK 11/14-15/01 Shell EXPROContinue Review of ISO 17078.2 15Houston, TX 2/07-08/02Prod. Assoc.Continue Review of ISO 17078.2, Address WG #4 Comments on 17078.1 16Houston, TX5/09-10/02BPComplete 1st Draft of ISO 17078.2 for WG #4 Review, Review ISO 17078.3 17San Antonio, TX 10/03-04/02SwRIContinue Review of ISO 17078.3 18Houston, TX TBDTBD 19Houston, TX TBDTBD 20TBDTBDTBD 1998 1999 2000 2001 2002 2003 BlueCompleted RustScheduled BlackTo Be Scheduled