OUTLINE Definitions Examples of Landfills in the Valley
Construction on Landfills Materials Placement in Landfills Developments on Landfills – why develop landfills ?? Concerns Associated with Development on Landfills Landfill Materials Investigation Remediation of Construction and Demolition (C&D) Landfills Example Projects
2
DEFINITIONS MSW Landfill C&D Materials Inert Debris Landfill
3
EXAMPLES OF LANDFILLS IN THE VALLEY
C&D Landfills Mostly Along the Salt River, Aqua Fria, Gila River & Santa Cruz River Created Generally by Mining of Aggregates for Concrete, Asphalt, and Base Course Materials Pits Left Behind are Backfilled with MSW or C&D 24th St Vulcan Materials, 28th St ( Dean Thomas Property), Salt River Pima Maricopa Dobson Plant Tempe Market Place
4
EXAMPLES OF LANDFILLS IN THE VALLEY
MSW Landfills Queen Creek Landfill 27th Ave Landfill Tempe Municipal Landfill Northwest Regional Landfill, and Others Inert Debris Landfills Salt River Materials Group Dobson Plant 28th Street Landfill 24th Street Landfill Cotton Lane Landfill Estrella Pit
5
MATERILAS PLACEMENT IN LANDFILLS
No Compaction During C&D Disposals No Processing is Completed Creates Nesting of Large Particles Blind Spots around Odd Shaped Particles Organics MSW Decomposes, Develops Settlement, LFG & Leachate
6
MATERILAS PLACEMENT IN LANDFILLS
7
DEVELOPMENTS ON THE LANDFILLS
Install Recreational Facilities Low Load Bearing Structures on Compacted MSW, e.g. Distribution Center Heavier Structures on MSW should be on Deep Foundations Industrial and Commercial Developments on C&D
8
CONCERNS ASSOCIATED WITH LANDFILL MATERIALS
Large Settlement Uneven/Differential Settlements Unpredictable – No Model Available on Stability Compaction by Itself Biodegradation Piping, Internal Erosion and Raveling Gas (LFG) and Leachate Production, Accumulation & Contamination of Air and Ground Water Organics in C&D Takes Too Long to Decompose
9
LANDFILL MATERIAL INVESTIGATION
10
SOLUTIONS TO PROBLEMS FOR C&D LANDFILLS
Deep Dynamic Compaction (DDC) for Inert Debris Landfills Compaction Grout Vibrofloatation (Not Common) Remove and Reconstruct w/ Engineered Fill/Debris
11
Deep Dynamic Compaction (DDC) Tempe Market Place
12
SOLUTIONS TO PROBLEMS FOR C&D LANDFILLS
Deep Dynamic Compaction (DDC): Effective up to 30’-35’ 30-ton Load Drop from feet Height, Multiple Times Imparts approx. 150 ton-ft/sq.ft. Equivalent to 150% of Standard Proctor Compaction up to 25 Foot Depth Evaluate Performance Can’t Take Care of all Piping and Raveling
13
2000 4000
14
Deep Dynamic Compaction
16
24th Street and Salt River– Vibration Monitoring
17
Performance Evaluation with Plate Load Test
18
SOLUTIONS TO PROBLEMS FOR C&D
Debris Fill Specifications Anything as long as Inert Debris 2 to 3 feet Lift Thickness Compaction with 10 to 15 ton Equipment 3 to 4 Passes with 20 to 30 hertz vibration 30 to 60 Gallons/Cu.Yd. Water
19
Debris Fill Specifications
20
28th Street and Salt River 24th Street and Salt River
EXAMPLE PROJECTS Tempe Market Place 28th Street and Salt River 24th Street and Salt River 14th Street and River View Drive
21
Tempe Market Place – Before Development
22
Tempe Market Place – During Stabilization
23
Tempe Market Place – After Development
24
24th Street & Salt River
25
CONCLUDING REMARKS Environmental Benefits Aesthetic Improvement