1
Agenzia Lucana di Sviluppo e di Innovazione in Agricoltura A.L.S.I.A. A.A.S.D.PANTANELLO BIOREM LIFE11 ENV/IT/000113 Meeting Metaponto, 25 July 2013
2
Progetto Biorem - Actions A. Preparatory actions A. Implementation actions B. Monitoring of the impact of the project actions C. Communication and dissemination actions D. Project management and monitoring of the project progress
3
B. Implementation actions The following three demostration plots (360 m 2 each) will be set up by PANTANELLO: -Bernalda-Metaponto (MT): vertisol characterized by high erosion and low water input; -Bernalda-Pisticci (MT): overexplited cambisol with poor vegetable cover; - Bernalda-Metaponto (MT): poorly developed semi-arid regosol Samples of soil from the 3 demostration plots will be collected (3 months) at 0-20 and 20-40 cm depth characterization of the initial soil conditions: B.1 Demonstration of the innovative soil monitoring method through a characterization of the initial soil conditions:
4
B. Implementation actions B.2 Demonstration of the addition of exogenous organic matter to 3 different types of soil The NATURE (compost, fresh organic matter, sewage sludge…) and the AMOUNT (about 20-25 kg m -2 ) of the organic amendment will be estabilished on the base of the initial soil conditions (action B.1 ). 0-20 cm depth The organic matter will be incorporated into the soil top layer (0-20 cm depth). Responsable: Alsia
5
B. Implementation actions B.3 Demonstration of BIOREM revegetation strategies The plants will be chosen as to be well adapted to water stress conditions and will depend on the initial soil characterization (action 1.1). The following plants could be selected: Pino halepensis, Pistacia lentiscus. The use of plants inoculated with micorrhizza might be contemplated. Responsable: PANTANELLO
6
B2. Demonstration addition organic matter 16 set 2013
7
B2. Demonstration revegetation strategies
8
B. Implementation actions The three selected fields will be set up and managed by PANTANELLO (3-5 months) Demostration plots (360 m 2 each) During all the phases of the actions, photos and videos will be taken 2.5 m wide strips will be left between sub-plots
9
B. Implementation actions Plant distance: 1x1 m Pino halepensis Pistacia lentiscus
10
B. Implementation actions B.2 Demonstration of the addition of exogenous organic matter to 3 different types of soil The NATURE (compost, fresh organic matter, sewage sludge…) and the AMOUNT (about 20-25 kg m -2 ) of the organic amendment will be estabilished on the base of the initial soil conditions (action B.1 ). 0-20 cm depth The organic matter will be incorporated into the soil top layer (0-20 cm depth). Responsable: ALSIA
11
B. Implementation actions B.4 Demostration of the innovative biochemical monitoring methodology Soil samples from all the sub-plots will be collected every six months: - immediately after the application of the remediation strategies (3-5 months) - monitoring genetic plant with support of CNR Firenze 0-20 and 20-40 cm depth Each soil sample will consist of three subsamples collected at 0-20 and 20-40 cm depth Each sample will consist of leaves plant used for soli regeneration PANTANELLO During these months, PANTANELLO will perform the ordinary management and empirical monitoring of the involved soils. PANTANELLO environmental reports PANTANELLO will provide environmental reports containing all the environmentally relevant information gathered from the previous actions.
12
B2. Demonstration revegetation strategies 25 settembre 2013
13
B2. Demonstration revegetation strategies 25 ottobre 2013 Weed elimination
14
C. Dissemination actions Project poster pubblication
15
C. Dissemination actions Seminars january and february
16
C. Dissemination actions Project poster pubblication
17
B. Implementation actions B.4 Demostration of the innovative biochemical monitoring methodology Soil samples from all the sub-plots will be collected every six months: -immediately after the application of the remediation strategies (3-5 months) -6 months later (10 months) -12 months later (16 months) -18 months later (22 months) 0-20 and 20-40 cm depth Each soil sample will consist of three subsamples collected at 0-20 and 20-40 cm depth PANTANELLO During these months, PANTANELLO will perform the ordinary management and empirical monitoring of the involved soils. PANTANELLO environmental reports PANTANELLO will provide environmental reports containing all the environmentally relevant information gathered from the previous actions.