Sprinkler Protection of Non-Storage Occupancies with High Ceiling Clearance May, 2014 Peter Thomas
2
Background Architectural designs create real fire protection challenges to fire engineers. “The Taller” seems to be “The Better” Sprinkler performance and effectiveness in buildings with high roofs and non-storage occupancies such as atria, convention centers, casinos, auditoriums, theaters, exposition halls and others, is not well understood.
3
Introduction – Current Situation
Convention Center Ceiling Height of 18 m What is sprinkler protection based on current installation standards?
4
Introduction – Current Situation
EN (OH 4) 5.0 mm/min 360 sq m NFPA 13 (OH 2) 8.1 mm/min 139 sq m 6.1 mm/min 372 sq m FMDS 3-26 (HC 3) 20.0 mm/min 280 sq m China GB (OH 1) 6.0 mm/min 160 sq m Australia AS (High Hazard- Process) 12 mm/min 360 sq m Singapore CP52 Not Allowed
5
Needs further research
2017年4月8日星期六 Test Summary from FM Test 1 Test 2 Test 3 Test 4 Exploratory Test 5 EC 25 Commodity (as per NFPA) Class II Group A Plastic Fuel Height 2.26 1.73 Ceiling 15.4 15.9 16.6 Deflector 15.2 15.7 16.4 Arrangement 8X8,solid, 2 tiers 2X8, solid, 1 tier density 12 mm/min 6 mm/min 18 mm/min. K-factor K115, RTI 140 K 80, RTI 140 K 160, RTI 28 K 360, RTI 28 Spacing 3.0 X 3.0 6.1 X 6.1 Conclusion Passed 15 heads operating Skipping Adequate 17 heads operating Failed 26 heads operating 16 heads operating 1 head operating No skipping Needs further research
6
Test Plan
7
Test Fuel and Fuel Array Arrangement
8
Sprinkler System
9
Full Scale Fire Test 1 Fuel Arrangement: Group A Plastics
Ceiling height: 12 m Fuel Height: 1.63 m Clearance to ceiling: 10.4 m Arrangement of fuel package: 8 by 2, solid pile Ignition Location: Under 1 sprinkler Density: 15 mm/min Sprinklers: K115, RTI 105 (m-s)1/2 Standard Response, Pendent Spacing: 3.0 m x 3.0 m
10
Full Scale Fire Test 1
11
Full Scale Fire Test 1
12
Full Scale Fire Test 1
13
Full Scale Fire Test 2 Fuel Arrangement: Group A Plastics
Ceiling Height: 16 m Fuel Height: 1.63 / 1.13 m Clearance to ceiling: 14.4 m Arrangement of fuel package: 8 by 2, solid pile Ignition Location: Under 1 sprinkler Density: 20 mm/min Sprinklers: K115, RTI 35 (m-s)1/2 Quick Response, Pendent Spacing: 3.0 m x 3.0 m
14
Full Scale Fire Test 2
15
Full Scale Fire Test 2
16
Full Scale Fire Test 2
17
Full Scale Fire Test 3 Fuel Arrangement: Group A Plastics
Ceiling Height: 16 m Fuel Height: 1.63 / 1.13 m Clearance to ceiling: 14.4 m Arrangement of fuel package: 8 by 2, solid pile Ignition Location: Under 1 sprinkler Density: 23 mm/min Sprinklers: K161, RTI 138 (m-s)1/2 Standard Response, Pendent Spacing: 3.0 m x 3.0 m
18
Full Scale Fire Test 3
19
Full Scale Fire Test 3
20
Full Scale Fire Test 4 Fuel Arrangement: Group A Plastics
Ceiling Height: 18 m Fuel Height: 1.63 m Clearance to ceiling: 16.4 m Arrangement of Fuel Package: 6 by 2, solid pile Ignition Location: Under 1 sprinkler Density: 40 mm/min Sprinklers: K363, RTI 130 (m-s)1/2 Standard Response, Pendent Spacing: 3.0 m x 3.0 m
21
Full Scale Fire Test 4
22
Full Scale Fire Test 4
23
Full Scale Fire Test 5 Fuel Arrangement: Group A Plastics
Ceiling Height: 18 m Fuel Height: 1.63 Clearance to Ceiling: 16.4 m Arrangement of Fuel package: 6 by 2, solid pile Ignition Location: Between 4 sprinklers Density: 40 mm/min Sprinklers: K363, RTI 130 (m-s)1/2 Standard Response, Pendent Spacing: 3.0 m x 3.0 m
24
Full Scale Fire Test 5
25
Full Scale Fire Test 5
26
Test Summary Effectiveness of sprinkler to control depends on delivered density Under 12 m ceiling, K 115 sprinkler at 15 mm/min. did not control the fire. Under 16 m ceiling, K115 sprinkler at 20mm/min. did not control the fire. A K160 sprinkler marginally controlled the fire at 23 mm/min. Under 18 m ceiling, K363 sprinkler at 40 mm/min. generates significantly larger drops and effectively controlled the fire.
27
Conclusion EN 12845 (OH 4) NFPA 13 (OH 2) FMDS 3-26 (HC 3)
5.0 mm/min 360 sq m NFPA 13 (OH 2) 8.1 mm/min 139 sq m 6.1 mm/min 372 sq m FMDS 3-26 (HC 3) 20.0 mm/min 280 sq m China GB (OH 1) 6.0 mm/min 160 sq m Change – 40 mm/min 160 sq m with K360 sprinklers Australia (AS ) (High Hazard- Process) 12 mm/min 360 sq m Singapore CP52 Not Allowed over 13 m Proposed change - 12 mm/min 360 sq m with K160 sprinklers