Download presentation
Presentation is loading. Please wait.
Published byNikolas Bursell Modified over 10 years ago
1
Disaster Recovery Plan By Chanrithy Pol ESA Regional Information System Analyst ITIL Certified / Certified Microsoft Solution Expert Share Point / Infrastructure Certified Radio communication Expert / MIT E-mail: Chanrithy.pol@crs.org, Tel : +85512898944/907810Chanrithy.pol@crs.org
2
Discussion Topics: 1.What is disaster ? 2.Type of disaster 3.What is recovery plan ? 4.Type of recovery plan 5.Open discussion
3
What is disaster ?
4
Type of disaster Electricity Failure Internet Failure Hardware & Software/Infrastructure Issues Lower Impact Fire Earthquake Tsunami Typhoon Medium Impact Earthquake Tsunami Flood Typhoon Data lost High Impact There are two type of Disasters: Natural Disaster Human Disaster
5
Goal: To prepare ahead before disaster happen. Immediately restore operations. Cost efficiency and effectiveness. To be awareness / First aid kits. Easy collaboration with another agencies. Simulate or Drill. Connectivity redundancy. Data redundancy. Electricity redundancy. Identify key staff. Hot site. What is recovery plan ?
6
Type of recovery plan Connectivity: At least two LAN lines install in one office. At least one mobile Sat phone is activated. At least one VHF Radio is activated with UN or Government Repeater. Require monthly simulate or drill. Password Security: At least two authorize persons responsible. At least keep password in electronic and paper. Password policy should be in place. Require quarterly drill.
7
Type of recovery plan Data security backup and restore: Basic data security policy should be in place. At least two data storages per office. At least basic one offsite storage per office. Require simulate or drill every Friday. Electricity Redundancy: At least one small generator standby per office. Possible Solar Penal power backup at main office. Require regular monthly maintenance.
8
Type of recovery plan Key staff: One person from management team. One person from IT department. One person from finance department. One person from administrative department. One security focus point. One person from logistic department. Quarterly require simulation. Hot Site: Identify one location per office. Require electricity power backup standby. Quarterly require simulation.
9
Open discussion Questions? or Suggestions ??
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.