1 THE SYSTEM OPERATOR STRUCTURE, REQUIREMENTS AND PERFORMANCE OF SYSTEM OPERATIONS IN THE NIGERIAN ELECTRICITY MARKET Engr Jonathan.U. Ndiagwalukwe

2 TCN APPROVED STRUCTURE FOR THE SYSTEM OPERATOR ED (System Operations) PM (Procurement) PM ( F&A )PM (Regulation) GM (Grid Control)NCC GM (Power Syst Plan) GM (Syst Ops) HQ GM (Technical Service) AGM (Ops Plan) AGM (Hydro) AGM Ancillary/Liaison AGM (Sys Control) AGM (PSPD) AGM(Ops &Plan) AGM(SO) SNCC/RCC Shiroro AGM(TS)WEST AGM Com Proj AGM(TS) EAST AGM SCADA Proj AGM(TS) NORTH

3 ROLE OF THE SYSTEM OPERATOR IN THE ELECTRICITY MARKET EXERCISE GRID CONTROL SO AS TO MAINTAIN EFFICIENT, COORDINATED AND ECONOMIC SUPPLY OF ELECTRICITY IN ACCORDANCE WITH THE GRID CODE AND OPERATIONAL PROCEDURES.

4 ROLE OF THE SYSTEM OPERATOR GRID FREQUENCY AND VOLTAGE CONTROL & ECONOMIC DISPATCH OF GENERATING UNITS LOAD ALLOCATION IN TIMES OF INSUFFICIENT GENERATION COORDINATE ALL PLANNED OUTAGES FOR THE MAINTENANCE OF SYSTEM EQUIPMENT DESIGN, INSTALL AND MAINTAIN SCADA AND COMMUNICATION FACILITIES FOR EFFECTIVE GRID OPERATIONS PROCURE & MANAGE ANCILLARY SERVICES ENFORCE THE GRID CODE AND THE OPERATIONAL PROCEDURES PERFORM POST FAULT ANALYSIS OF ALL MAJOR GRID DISTURBANCE

5 GENERATION PROFILE (2007 – 2011) YEARAVE. GEN. AVAILABILIT Y (MW) PEAK GENERATION (MW) MAXIMUM DAILY ENERGY GENERATED (MWH) TOTAL ENERGY GENERATED (MWH) TOTAL ENERGY SENT OUT (MWH) % LOSSES 20074,156.193,599.6075,372.0023,186,542.9222,255,754.838.25 20084,232.613,596.9079,897.0521,597,413.2821,041,043.679.05 20094,825.173,710.0082,652.3720,893,432.8020,329,451.428.41 20104,212.703,804.3085,457.4925,020,297.1124,362,423.469.98 2011 (JAN – OCT) 4,328.424,054.2090,315.2722,585,507.6422,001,560.269.32

6 GENERATION PROFILE MAXIMUM ACTUAL GENERATION CAPABILITY TO DATE OF 5317MW (6/10/11) PEAK GENERATION TO DATE OF 4,054.2MW PLUS MAXIMUM ENERGY GENERATED TO DATE OF 90,315.27MWh (16/04/11) SPINNING RESERVE CAPACITY OF 300MW AS AT TODAY 29/11/11

7 POWER QUALITY ISSUES 1. FREQENCY CONTROL A MEASURE OF STABILITY ACHIEVED WITH THE INTRODUCTION OF SPINNING RESERVE ON 15/01/2011. SIGNIFICANT REDUCTION IN THE NUMBER OF SYSTEM COLLAPSES. EGBIN, KAINJI & DELTA REGULATING THE SYSTEM AT PRESENT. IPPs HAVE BEEN INVITED TO JOIN BUT THEY ARE YET TO DO SO. ANCILARY SERVICES INCENTIVE NOW EXISTS NERC TO ENFORCE SPECIFICATIONS FOR NEW PLANTS COMING INTO THE GRID. TOO MANY BASE LOAD MACHINES IN THE SYSTEM.

8 POWER QUALITY ISSUES 2. VOLTAGE CONTROL LOW VOLTAGE PROBLEM IN THE NORTH AFFECTING ABUJA, KADUNA, KANO AND GOMBE MORE COMPENSATION DEVICES LIKE CAPACITOR BANKS REQUIRED IN THE INTERIM. SYNCHRONOUS CONDENSER OPERATION OF SHIRORO MACHINES YET TO BE EXPLORED LONG TERM SOLUTION IS TO HAVE GENERATION IN THESE LOCATIONS, MAMBILA FOR EXAMPLE. HIGH VOLTAGE NODES LIKE BENIN, OSOGBO AND BIRNIN KEBBI NEED REACTORS. BENIN HAS JUST RECEIVED ONE FOR INSTALLATION. COORDINATED GRID DEVELOPMENT INVOLVING THE SO, TSP, GENCOS DISCOS A NECESSITY

9 GRID STABILITY AND SECURITY RADIAL NETWORK. TRIPPING OF A SINGLE LINE CAN COLLAPSE THE SYSTEM. LOOPS ON THE GRID LIKE ALAOJI-IKOT EKPENE-UGWUAJI-MAKURDI-JOS 330KV LINE UNDER CONSTRUCTION AND THE PROPOSED ALAOJI-P/H-DELTA LINES WILL ACHIEVE THIS POWER EVACUATION FROM THE SOUTH EAST LIMITED BY SECURITY ISSUES ARISING FROM CRITICAL LINES THAT ARE SINGLE CIRCUITS (ALAOJI-ONITSHA AND BENIN- ONITSHA 330KV LINES). 2 ND BENIN- ONITSHA 330KV LINE BILLED FOR COMPLETION IN THE 1 ST QUARTER OF 2012. 2 ND ALAOJI-OWERRI-NNEWI-ONITSHA 330KV LINE STILL AT PROCUREMENT STAGE ONLY DELTA POWER STATION CAN BLACKSTART THE SYSTEM AT PRESENT GAS SUPPLY ISSUES

10 COMMUNICATIONS EFFECTIVE COMMUNICATIONS IS A VITAL TOOL FOR SYSTEM OPERATIONS. SERVES FOR VOICE, TELEPROTECTION AND SCADA VARIOUS COMMUNICATION MEDIA OPTIC FIBRE POWER LINE CARRIER (PLC) MICROWAVE RADIO GSM THE SO IS CURRENTLY WORKING WITH A CONSULTANT TO INTEGRATE VARIOUS EQUIPMENT FROM DIFFERENT VENDORS FOR OPTIMAL PERFORMANCE OF THE COMMUNICATION SYSTEM.

11 SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) AN ABSOLUTE NECESSITY FOR REAL TIME GRID OPERATION OLD SCHEME HAS 26 RTUs WITH HIGH RTU OUTAGE RATE MEASURERANDS INACCURATE AND UNRELIABLE NEW SCADA SCHEME BY SIEMENS (NIG) EQUIPPED WITH 130 RTUs IS YET TO BE COMMISSIONED IN-HOUSE SCADA RESTORATION TEAM SETUP ONE YEAR MTCE CONTRACT APPROVED FOR SIEMENS OF GERMANY TO REHABILITATE THE NEW SCHEME

12 GRID CODE & OPERATIONAL PROCEDURES GRID CODE EXISTS WITH AMENDMENTS REQUIRED FORENSIC REVIEW OF THE GRID CODE WITHIN SYSTEM OPERATIONS IN PROGRESS. AMMENDMENTS TO BE PROPOSED TO NERC AFTER THE FORENSIC WORKSHOP GRID CODE AWARENESS WORKSHOPS FOR STAKEHOLDERS TO CONTINUE AFTER THE FORENSIC REVIEW. OPERATIONAL PROCEDURES TO BE REVISED TO MEET CURRENT REALITIES OPERATIONAL PROCEDURES AWARENESS WORKSHOPS TO BE ORGANIZED

13 RING FENCING OF THE SO CURRENTLY THE SO IS TOTALLY DEPENDENT ON TCN FOR THE FUNDING OF OPERATIONAL, ADMINSTRATIVE AND FINANCIAL ACTIVITIES. IT IS DIFFICULT TO FUNCTION PROPERLY UNDER THE PRESENT CIRCUMSTANCE, GIVEN THE NUMEROUS THE VARIOUS ACTIVITIES LIKE SPINNING RESERVE MGT, GRID CODE FORENSIC WORKSHOP, FREQUENCY MGT MEETINGS, GRID CODE AWARENESS WORKSHOPS, OPERATIONAL PROCEDURE REVIEWS ETC. SOME INDEPENDENCE REQUIRED IF THE SO IS TO MEET ITS OBLIGATIONS TO THE MARKET. THE SO SHALL NOT RELENT UNTIL THERE IS STABLE, SECURE AND RELIABLE POWER SUPPLY IN NIGERIA.

14 THANK YOU