Download presentation
Presentation is loading. Please wait.
Published byTrent Eastman Modified over 10 years ago
1
http://www.dorii.eu/ DORII: Training for Pilot Application Evaluation Paolo Gamba Matteo Lanati
2
Components Computing element Storage element Virtual organisation Coordinated and secure sharing
3
Components (2) Computing element Storage element Virtual organisation Information service BDII (Berkeley Database Information Index) Broker / WMF Metadata and filecatalog Instrument element
4
Workload Management System
5
Instrument Element: requirements Control and monitoring of up to 10 4 nodes Web access RTT like human reaction time Maximum response time Fast collection time Reliable message delivery Reach a single point of storage Online diagnostic and recovery
6
Instrument Element: definition & architecture the term Instrument Element describes a set of services that provide the needed interfaces and implementation enabling the remote control and monitoring of physical instruments. Set of interfaces Virtual instrument grid services Virtual Control Room interaction
7
Instrument Element: control manager
8
Instrument Element: what we need Instrument manager definition XML file containing state definition commands for state transition attributes (subscribe, lock,...) Java file containing class describing commands
9
User (VCR installed) Grid Network Sensing Unit ( IE + IM deployed ) Sensor Arduino Board Use case
10
General framework VCR Workflow Monitor WF manag system CESEIEWFMLFC tunnel gEclipse client Multipurpose virtual laboratory Middleware
11
DORII applications Deployment Of Remote Instrumentation Infrastructure Two proposals: network-centric seismic simulations (pseudo-dynamic tests) eartquake early warning system (vulnerability curves) Consortium decided the priority: Pilot applications (1 st release in 1 year): simulations + oceanic and costal observation by gliders (OGS) and images (UC) Non Pilot applications: EEWS + on line tomography data analysis (Elettra)
12
What is expected by Eucentre Accessibility to the infrastructure Support for adaptation to the grid
13
A close look to NCSS Actuators (controllers) PDE solver (TREMURI) Sensors (gyroscopes) Measurements (sensors) Sensors (video) PDE solutions (TREMURI)
14
Detailed task list for Developers /Scientists 1.Registration 2.Login 3.Credential Management 4.Select Eucentre's IE element
15
Detailed task list for Developers /Scientists 1.Apply the force to the specimen using hydraulic valve IM 2.Check the force using the load cell IM
16
Detailed task list for Developers /Scientists 1.Start the synchronous acquisition 2.Repeat 5 – 6 until completing the cycle test
17
Detailed task list for Developers /Scientists 1.Possible interaction with other users 2.Stop the acquisition 3.Data movement, if needed 4.Launch the job (filtering and computation) 5.Collect data 6.Log out
18
Detailed task list for Technicians 1.Registration 2.Login 3.Credential Management 4.Select Eucentre's IE element 5.Select load cell 6.Check data for safety reason 7.Possible interaction with other users 8.Launch filtering job 9.Data collection 10.Log out
19
Thank you for your attention and … Let's start
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.