Presentation is loading. Please wait.

Presentation is loading. Please wait.

CBM slow controls 13.04.2010 CBM collaboration meeting DAQ work group 13.04.2010 CBM collaboration meeting DAQ work group Burkhard Kolb GSI1.

Similar presentations


Presentation on theme: "CBM slow controls 13.04.2010 CBM collaboration meeting DAQ work group 13.04.2010 CBM collaboration meeting DAQ work group Burkhard Kolb GSI1."— Presentation transcript:

1 CBM slow controls 13.04.2010 CBM collaboration meeting DAQ work group 13.04.2010 CBM collaboration meeting DAQ work group Burkhard Kolb GSI1

2 13.04.2010 Burkhard Kolb GSI2 Strategy  Slow control - DCS - ECS has not to be „per se“ a field of experiment and new development  It should work!  Slow control - DCS - ECS has not to be „per se“ a field of experiment and new development  It should work!

3 13.04.2010 Burkhard Kolb GSI3 What it should provide  Safe operation of the experiment  Set up, control and monitoring of detectors, DAQ/trigger and environment  Alarm handling  Archiving  Safe operation of the experiment  Set up, control and monitoring of detectors, DAQ/trigger and environment  Alarm handling  Archiving

4 13.04.2010 Burkhard Kolb GSI4 Strategy (2)  Use  existing  well tested  supported solutions  Use  Open Source wherever possible  Join  existing development collaborations  Use  existing  well tested  supported solutions  Use  Open Source wherever possible  Join  existing development collaborations

5 13.04.2010 Burkhard Kolb GSI5 What has to be developed  Drivers and interfaces to custom hard/software  Support for new platforms  FPGA  Radiation tolerance  Detect failures - repair failures  Drivers and interfaces to custom hard/software  Support for new platforms  FPGA  Radiation tolerance  Detect failures - repair failures

6 13.04.2010 Burkhard Kolb GSI6 What exists  Existing slow control systems  EPICS (open source)  LabView (commercial)  PVSS (commercial - higher layers only)  Tango (still under development)  TINE (still under development)  Existing slow control systems  EPICS (open source)  LabView (commercial)  PVSS (commercial - higher layers only)  Tango (still under development)  TINE (still under development)

7 13.04.2010 Burkhard Kolb GSI7 Strategy (3)  We have chosen EPICS!  Why?  It works!  We have in house experience  It provides solutions for all common hardware (HV, LV, gas, …)  It‘s for free  It‘s scalable  Huge collaboration - ITER will use it too!  We have chosen EPICS!  Why?  It works!  We have in house experience  It provides solutions for all common hardware (HV, LV, gas, …)  It‘s for free  It‘s scalable  Huge collaboration - ITER will use it too!

8 13.04.2010 Burkhard Kolb GSI8 What has to be done  Support for EPICS in FPGAs  Porting RTEMS to SysCore board and installing EPICS (KIP)  Interfacing to FPGA resources via simple protocol (Where resources are limited)  Radiation tolerant behaviour  Watchdogs, …  Support for EPICS in FPGAs  Porting RTEMS to SysCore board and installing EPICS (KIP)  Interfacing to FPGA resources via simple protocol (Where resources are limited)  Radiation tolerant behaviour  Watchdogs, …

9 13.04.2010 Burkhard Kolb GSI9 What else  Process control for DAQ  Either with EPICS clients/servers  Works in HADES@GSI  Or with system in DAQ  Provide EPICS server for monitoring  Process control for DAQ  Either with EPICS clients/servers  Works in HADES@GSI  Or with system in DAQ  Provide EPICS server for monitoring

10 13.04.2010 Burkhard Kolb GSI10 Interfaces  EPICS connects with:  LabView  DIM  SNMP  OPC  EPICS connects with:  LabView  DIM  SNMP  OPC

11 13.04.2010 Burkhard Kolb GSI11 GUI  CSS (control system studio)  Is developed at DESY  Based on Eclipse  Works on many platforms  Windows, Linux, MacOS  Provides  Synoptic display  Archive view  Interfaces  To other control systems (Tango, TINE)  CSS (control system studio)  Is developed at DESY  Based on Eclipse  Works on many platforms  Windows, Linux, MacOS  Provides  Synoptic display  Archive view  Interfaces  To other control systems (Tango, TINE)

12 13.04.2010 First prototype EPICS server controlling –CAEN HV –WAGO temperature readout –Corvus motor control –Keithley picoammmeter –Agilent/Lambda power supplies (not used) –EPICS GUI client based on CSS/SDS –EPICS data archiver and server EPICS server controlling –CAEN HV –WAGO temperature readout –Corvus motor control –Keithley picoammmeter –Agilent/Lambda power supplies (not used) –EPICS GUI client based on CSS/SDS –EPICS data archiver and server Burkhard Kolb GSI12

13 13.04.2010 Test beam time example Burkhard Kolb GSI13

14 13.04.2010 Burkhard Kolb GSI14 Manpower  Basic support (BK, PZ)  In house development (PZ)  Radiation tolerance (KIP, FH Köln)  Detector instrumentation (ext. groups)  DAQ interface (EE)  …  Basic support (BK, PZ)  In house development (PZ)  Radiation tolerance (KIP, FH Köln)  Detector instrumentation (ext. groups)  DAQ interface (EE)  …

15 13.04.2010 Construction of second prototype for next t e s t b e a m e x p e r i m e n t  When is next test beam?  What will be in the setup?  Construction of prototypes for all detector / subsystem control equipment:  DCS board production (6 months FE, GSI, FH Köln)  Silicon Pixel (3 months FE, GSI, NN of det group)  Silicon Microstrip(3 months FE, GSI, NN of det group)  Rich(3 months FE, GSI, NN of det group)  TRD (3 months FE, GSI, NN of det group)  TOF (3 months FE, GSI, NN of det group)  ECAL (3 months FE, GSI, NN of det group)  MUCH (3 months FE, GSI, NN of det group)  Magnet (3 months FE, GSI, NN of det group)  DAQ (3 months FE, GSI, NN of det group)  Cave/Infrastructure (3 months FE, GSI, NN of det group)  RICH gas system(3 months FE, GSI, Pusan/Korea)  When is next test beam?  What will be in the setup?  Construction of prototypes for all detector / subsystem control equipment:  DCS board production (6 months FE, GSI, FH Köln)  Silicon Pixel (3 months FE, GSI, NN of det group)  Silicon Microstrip(3 months FE, GSI, NN of det group)  Rich(3 months FE, GSI, NN of det group)  TRD (3 months FE, GSI, NN of det group)  TOF (3 months FE, GSI, NN of det group)  ECAL (3 months FE, GSI, NN of det group)  MUCH (3 months FE, GSI, NN of det group)  Magnet (3 months FE, GSI, NN of det group)  DAQ (3 months FE, GSI, NN of det group)  Cave/Infrastructure (3 months FE, GSI, NN of det group)  RICH gas system(3 months FE, GSI, Pusan/Korea) Burkhard Kolb GSI15

16 13.04.2010 Burkhard Kolb GSI16 Requirements DB  In collaboration with PANDA we have set up a database with web access  http://nuclear.gla.ac.uk/CBM-DCS/ http://nuclear.gla.ac.uk/CBM-DCS/  Register  Then enter requirements:  Process variables  Common hardware  …  In collaboration with PANDA we have set up a database with web access  http://nuclear.gla.ac.uk/CBM-DCS/ http://nuclear.gla.ac.uk/CBM-DCS/  Register  Then enter requirements:  Process variables  Common hardware  …

17 13.04.2010 Burkhard Kolb GSI17 Example screen shot

18 13.04.2010 Documentation in the wiki  http://cbm-wiki.gsi.de/DCS Burkhard Kolb GSI18


Download ppt "CBM slow controls 13.04.2010 CBM collaboration meeting DAQ work group 13.04.2010 CBM collaboration meeting DAQ work group Burkhard Kolb GSI1."

Similar presentations


Ads by Google