Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.

Similar presentations


Presentation on theme: "Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1."— Presentation transcript:

1 Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

2 Agenda Completed Construction Projects PCC Learning Resource Center Current & Upcoming Construction Projects LAC Central Plant LAC South Quad Complex LAC Learning Resource Center LAC Building A, Student Services Retrofit LAC Math Technology Building LAC Parking Structure LAC Infrastructure Improvements – Phase 3 PCC Central Plant PCC Industrial Tech Phase 1 PCC MDAB (Multi-Disciplinary Academic Building) PCC Building C Retrofit District Wide Building Needs Assessment Projects  Toilet Improvement Projects  Quick-Start Projects  ADA Projects  Lighting Projects  Classroom Improvement Projects Q & A 2

3 Completed Construction Projects Construction Complete Modern Facility with Computer Lab and Multimedia Stand alone Data Center. Provides District IT redundancy Bridge to building E Design elements move towards energy efficiencies Ribbon cutting held 9/17/08 PCC Learning Resource Center – Measure E 2002 3

4 Current and Upcoming Construction Projects Central Plant equipment, Public Safety, & Field House for Athletics Final FF&E installation underway Plant ready for operation and awaiting completion of LRC & SQC Construction 99% Complete Anticipated startup 11/08 LAC Central Plant – Measure E 2002 4

5 Current and Upcoming Construction Projects Construction approx. 86% Complete Space includes Approx. 68,000 ASF 32 modern classrooms and labs 38 faculty offices Executive office suites Multipurpose room State of the art Board Room Substantial completion anticipated December 2008 South Quad Complex – Measure E 2002 5

6 Current and Upcoming Construction Projects Construction 89% Complete Adds 10,000 ASF to existing building Substantial Completion Anticipated December 2008 LAC/Learning Resource Center – Measure E 2002 6

7 Current and Upcoming Construction Projects Design Development to be submitted this month Adds 4,000 ASF to existing building Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc. LAC Building A – Student Services Retrofit Measure E 2008 7

8 Current and Upcoming Construction Projects Completed Schematic Design (June 2008) Currently in Design Development phase Will house Math and Culinary Arts instructional program as well as Reprographics Estimated start of construction 2011 LAC Math Technology Building – Measure E 2008 8

9 Current and Upcoming Construction Projects Planning initiated for approximately 900 Vehicles To be procured under “Design Build Delivery” method To be located Southeast corner of Lot J adjacent to the Verizon building Photovoltaic Electrical Generation Array on top level of structure Anticipated start of construction 2009 LAC Parking Structure – Measure E 2008 9

10 Current and Upcoming Construction Projects LAC Infrastructure Improvements – Phase 3 Measure E 2008 Planning underway with P2S Engineering Completes chilled water lines to North side of campus Includes other major utility upgrades; RW,DW, Data, etc. Existing building HVAC systems to be upgraded in synch with infrastructure improvements Coordinated with modernization and quick start projects 10

11 Current and Upcoming Construction Projects Houses Central Plant equipment and Maintenance and Operations facility Construction Approximately 99% Complete Currently provides chilled water to the PCC LRC PCC Central Plant – Measure E 2002 11

12 Current and Upcoming Construction Projects Modern facility houses Machine Tool and Welding Departments Construction is 42% complete Replaces existing antiquated structures New Northern face of the campus Completion anticipated summer 2009 PCC Industrial Technology Center Phase 1 Measure E 2002 12

13 Current and Upcoming Construction Projects 50% construction documents submitted Swing space planning completed 9/2008, construction Spring 2009 Anticipated start of MDAB construction Summer 2009 To be completed in two phases PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2002 13

14 Current and Upcoming Construction Projects To be designed by Hill Partnership Architects Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices Swing space to be located in PCC building V Anticipated start of construction Summer 2009 To be completed concurrently with MDAB project PCC Building C Retrofit - Measure E 2008 14

15 Current and Upcoming Construction Projects Toilet Improvement Projects Quick-Start Projects ADA Projects District Wide Building Needs Assessment Project Measure E 2008 15

16 Current and Upcoming Construction Projects Lighting Projects Classroom Improvement Projects District Wide Building Needs Assessment Projects Measure E 2008 16

17 QUESTIONS & ANSWERS EDUCATE  ENGAGE  EMPOWER 17