1
Nov 13 th 2013 Paul Coates P_coates1@sky.com Thoughts on BIM Maturity Teams Organisations Individuals Projects
2
Nov 13 th 2013 Paul Coates P_coates1@sky.com
3
Nov 13 th 2013 Paul Coates P_coates1@sky.com Informational islands that have historically existed in the AEC industries (Hannus 1995)
4
Nov 13 th 2013 Paul Coates P_coates1@sky.com Planner Explain Building Control End User Client Design Team Connecting The requirement for each party is different Semiotics Contractor Model view definitions
5
Nov 13 th 2013 Paul Coates P_coates1@sky.com The Red Queen Effect As Best Practice advances, it is necessary to change to remain competitive
6
Nov 13 th 2013 Paul Coates P_coates1@sky.com
7
Nov 13 th 2013 Paul Coates P_coates1@sky.com Why do we want BIM maturity ? To Achieve Better Buildings
8
Nov 13 th 2013 Paul Coates P_coates1@sky.com BIM File Organisation (Heng 2011)
9
Nov 13 th 2013 Paul Coates P_coates1@sky.com How can we achieve this?
10
Nov 13 th 2013 Paul Coates P_coates1@sky.com ????
11
Nov 13 th 2013 Paul Coates P_coates1@sky.com Level 2 A managed 3D environment held in separate discipline 'BIM' tools with data attached. Commercial data will be managed by enterprise resource planning software and integrated by proprietary interfaces or bespoke middleware. This level of BIM may utilise 4D construction sequencing and/or 5D cost information. The Government’s BIM Strategy Paper calls for the industry to achieve Level 2 BIM by 2016. Level 3 A fully integrated and collaborative process enabled by 'web services' and compliant with emerging Industry Foundation Class (IFC) standards. This level of BIM will utilise 4D construction sequencing, 5D cost information and 6D project lifecycle management information.
12
Nov 13 th 2013 Paul Coates P_coates1@sky.com Consult Australia 2010
13
Nov 13 th 2013 Paul Coates P_coates1@sky.com BIM Maturity Indexes COBIT BIM Meetlat BIM Successpredictor BIMM (Succar 2009) NBIMS CMM (McCuen and Suermann 2007)
14
Nov 13 th 2013 Paul Coates P_coates1@sky.com Control Objectives for Information and Related Technology (COBIT)
15
Nov 13 th 2013 Paul Coates P_coates1@sky.com Capability Maturity Model Integrates
16
Nov 13 th 2013 Paul Coates P_coates1@sky.com Bilal Succar 2004 Technology Process Policy SoftwareHardwareNetwork ContractualRegulatory Preparatory Leadership Infra Structure Human |Resources Products & Services BIMe http://bimexcellence.net/
17
Nov 13 th 2013 Paul Coates P_coates1@sky.com NBIMS 2007
18
Nov 13 th 2013 Paul Coates P_coates1@sky.com BIM IMPLEMENTATION: MANCHESTER TOWN HALL COMPLEX RESEARCH REPORT (University of Salford)
19
Nov 13 th 2013 Paul Coates P_coates1@sky.com NBIMS 2007
20
Nov 13 th 2013 Paul Coates P_coates1@sky.com NBIMS 2007
21
Nov 13 th 2013 Paul Coates P_coates1@sky.com Skills required ? David Cracknell
22
Nov 13 th 2013 Paul Coates P_coates1@sky.com Skills required ? Indiana University BIM Proficiency Matrix (BPM) projects.buildingsmartalliance.org/files/?artifact_id=3364
23
Nov 13 th 2013 Paul Coates P_coates1@sky.com
24
Nov 13 th 2013 Paul Coates P_coates1@sky.com
25
Nov 13 th 2013 Paul Coates P_coates1@sky.com
26
Nov 13 th 2013 Paul Coates P_coates1@sky.com
27
Nov 13 th 2013 Paul Coates P_coates1@sky.com Efficiency gains of collaborative BIM (Smith 2012)
28
Nov 13 th 2013 Paul Coates P_coates1@sky.com Synchronous vs Asynchromous Communication – Graphic credit Ramius Best Solution
29
Nov 13 th 2013 Paul Coates P_coates1@sky.com Successful Collaboration has been described as Synergy, where the sum is greater than all the parts; i.e. 2+2=5.
30
Nov 13 th 2013 Paul Coates P_coates1@sky.com The concept of a BIM Big Room to facilitate collaboration
31
Nov 13 th 2013 Paul Coates P_coates1@sky.com Revit Server 2013
32
Nov 13 th 2013 Paul Coates P_coates1@sky.com Autodesk Buzzsaw
33
Nov 13 th 2013 Paul Coates P_coates1@sky.com BIM viewed as a sociotechnical system with technological base of social components (Kennerley 2012)
34
Nov 13 th 2013 Paul Coates P_coates1@sky.com Collaboration on multiple devices
35
Nov 13 th 2013 Paul Coates P_coates1@sky.com Information Delivery Manual An information delivery manual (IDM) provides significant help in getting the full benefit from a building construction information model (BIM). If the information required is available when it is needed and the quality of information is satisfactory, the construction process itself will be greatly improved.
36
Nov 13 th 2013 Paul Coates P_coates1@sky.com Tool for Benchmarking BIM Performance of Design, Engineering and Construction Firms in The Netherlands Rizal Sebastian and Leon van Berlo AECbytes Viewpoint #33 (December 6, 2007) The Interactive Capability Maturity Model and 2007 AIA TAP BIM Award Winners Tammy McCuen, Major Patrick Suermann, P.E. An integrated approach to BIM competency assessment, acquisition and application Bilal Succar, Willy Sher, Anthony Williams CIFE, NBIMS References
37
Nov 13 th 2013 Paul Coates P_coates1@sky.com