STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING July 14, 2014 Crabtree, Rohrbaugh & Associates, Architects Agenda Opening Remarks Overview/Purpose Design Team Introductions Schematic Design Concepts Site Plan Building General Timeline Your Thoughts/Questions
2
State High Renewal – Schematic Design Concepts Site Improvement Goals Access Management and Circulation Vehicular and Pedestrian Sufficient Parking at Appropriate Locations Short-Term/Visitor Event Improved Storm Water Management Minimize Impervious Footprint Enhanced ADA Accessibility Maintain Physical Education and Athletic Facilities
3
State High Renewal – Schematic Design Concepts Overall Campus Concept for Future Community Field Improvements (Not Part of the Renewal) New Athletic Field (Grass, Included in Renewal)
4
State High Renewal – Schematic Design Concepts 4-Way, Signalized Intersection Drop-off and ADA parking Main Parking North (Band Practice) Main Parking South (Track) Bus Staging for Dismissal and Event Parking Drop-off Loop & Visitor Parking Primary SWM Area (South) Primary SWM Area (North) Separate Bus Access
5
Architectural Massing Study Views State High Renewal – Schematic Design Concepts
6
Massing Study - Aerial View Looking North State High Renewal – Schematic Design Concepts
7
Massing Study - Aerial View Looking South State High Renewal – Schematic Design Concepts
8
Massing Study – Looking West (above O’Bryan Ln.) State High Renewal – Schematic Design Concepts
9
Massing Study – Looking South State High Renewal – Schematic Design Concepts
10
Massing Study – Looking Southeast State High Renewal – Schematic Design Concepts
11
Massing Study – Looking Southeast (above Welch) State High Renewal – Schematic Design Concepts
12
Massing Study - Main Entry View State High Renewal – Schematic Design Concepts
13
State High Renewal – General Timeline Overall Goal – Construction Start Summer 2015 Approximate 30 month duration – in Phases Municipal and State Approvals Concurrent with Construction Documents and District Process Municipal Land Development Plans (Preliminary & Final) Conditional Use for Parking Reduction (with Prelim. LD) Zoning (Building Height and other Variances) Traffic Study State NPDES (Storm Water) PennDOT for Traffic Signal Permits
14
State High Renewal – General Timeline Regulatory Agency Review JuneJulyAugSeptOctNovDecJanFebMarAprMayJuneJuly Design Review w/ Borough Zoning Variance Application & Hearing Traffic Impact Study Start Land Development Plan Process Prelim. LD & Cond. Use Final LD Plan review/approval NPDES/PCSM review/approval Traffic Signal Permitting Misc. Permits/Approvals Design/Prep duration Agency Review duration
15
STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING July 14, 2014 Crabtree, Rohrbaugh & Associates, Architects Your Thoughts?