Download presentation
Presentation is loading. Please wait.
Published byJaniya Mains Modified over 10 years ago
1
NADIR workshop - October 25-26, 2011page 1 / 16 Density and Winds Inferred from GOCE Accelerometer (thrusters) Data Sean Bruinsma CNES, Toulouse Eelco Doornbos Delft University of Technology
2
NADIR workshop - October 25-26, 2011page 2 / 16 ESA contract No. 4000102847/11/NL/EL with TU Delft Consortium:TU Delft- Management and production CNES- Product evaluation HTG - Non-gravitational force modeling Project information http://thermosphere.tudelft.nl/goceplustheme3/ (nb: register first)
3
NADIR workshop - October 25-26, 2011page 3 / 16 Launch: 17 march 2009 (Plesetsk) Mission objectives: Determine geoid with an accuracy of 2 cm and gravity anomalies with an accuracy of 1-2 mGal (1-2 10 -5 m/s 2 ) at a resolution of 100 km (degree 200) Mission orbit: Sun-synchronous (i=96.5°), dawn/dusk, 255 km altitude Payload: Gradiometer (accelerometers), GPS receiver, laser retroreflector Drag control: Ion thrusters commanded in closed-loop GOCE: ESA’s first Earth Explorer
4
NADIR workshop - October 25-26, 2011page 4 / 16 GOCE: ESA’s first Earth Explorer
5
NADIR workshop - October 25-26, 2011page 5 / 16 GOCE mission in perspective
6
NADIR workshop - October 25-26, 2011page 6 / 16 GOCE mission in perspective
7
NADIR workshop - October 25-26, 2011page 7 / 16 GOCE mission in perspective
8
NADIR workshop - October 25-26, 2011page 8 / 16 GOCE: drag and solar radiation
9
NADIR workshop - October 25-26, 2011page 9 / 16 GOCE: drag and solar radiation
10
NADIR workshop - October 25-26, 2011page 10 / 16 GOCE natural decay & drag-free Natural decay (about 3 months, not shown) followed by drag-free flight starting 13 September 2009 at the mission altitude of 254.9 km (NB: the figure shows mean spherical altitude) Density inferred from accelerometer data Density inferred from thrusters+accelerometer data
11
NADIR workshop - October 25-26, 2011page 11 / 16 GOCE thrusters data
12
NADIR workshop - October 25-26, 2011page 12 / 16 GOCE thrusters data Thrust < 3mN: noise (red line=3-point average Thruster data sampling: 8 s
13
NADIR workshop - October 25-26, 2011page 13 / 16 Preliminary GOCE densities
14
NADIR workshop - October 25-26, 2011page 14 / 16 Preliminary GOCE densities
15
NADIR workshop - October 25-26, 2011page 15 / 16 Preliminary GOCE densities
16
NADIR workshop - October 25-26, 2011page 16 / 16 GOCE densities To do: Implement satellite model Combine thrusters and accelerometer data Compute densities and winds Validate products Poster in session SA10 at the AGU Fall Meeting
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.