Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mirjam Kühne 1 RIPE 34, September 1999 RIPE NCC Status RIPE NCC Staff presented by Mirjam Kühne.

Similar presentations


Presentation on theme: "Mirjam Kühne 1 RIPE 34, September 1999 RIPE NCC Status RIPE NCC Staff presented by Mirjam Kühne."— Presentation transcript:

1 Mirjam Kühne 1 RIPE 34, September 1999 RIPE NCC Status RIPE NCC Staff presented by Mirjam Kühne

2 RIPE 34 PlenaryMirjam Kühne 2 Outline Statistics Services

3 RIPE 34 PlenaryMirjam Kühne 3 RIPE DNS Hostcount

4 RIPE 34 PlenaryMirjam Kühne 4 1,5 New Members/Day

5 RIPE 34 PlenaryMirjam Kühne 5 Closed LIRs phase1: phase2: phase3: phase4: LIRs closed for various reasons:

6 RIPE 34 PlenaryMirjam Kühne 6 DB Queries Reach 5/sec 13,091,219 (~5 /sec) (~2 /sec)

7 RIPE 34 PlenaryMirjam Kühne 7 10 DB Updates/min 429,884

8 RIPE 34 PlenaryMirjam Kühne 8 DB Objects Exceed 2,5 Million 2,602,809

9 RIPE 34 PlenaryMirjam Kühne 9 New hostmaster Requests 1,452

10 RIPE 34 PlenaryMirjam Kühne 10 Address Space Usage

11 RIPE 34 PlenaryMirjam Kühne 11 AS Numbers

12 Mirjam Kühne 12 RIPE 34, September 1999 Services

13 RIPE 34 PlenaryMirjam Kühne 13 Activity Plan 2000 (ripe-197) Membership Services –Registration Services –Test Traffic Measurement Coordination Services New Projects –RIS –RR Consistency

14 RIPE 34 PlenaryMirjam Kühne 14 Registration Services Avg. response time 2-3 days Start processing IPv6 requests New manager: Nurani Nimpuno Efficient Procedures –No radical staff increase

15 RIPE 34 PlenaryMirjam Kühne 15 IPv6 20 queries received in total –10 address space requests –5 sub-TLAs allocated 3 ranges reverse delegated Good co-operation with RIRs and 6bone Smooth Start Few open issues (IPv6-WG)

16 RIPE 34 PlenaryMirjam Kühne 16 LIR Training Courses 13 courses delivered since last meeting 14 courses planned –SE, DE, TR, IT, FR, RU, UK, GR, NL, SK, IE New course material ready soon http://www.ripe.net/lir/courses/nextcourses.html

17 RIPE 34 PlenaryMirjam Kühne 17 RIPE Database Redundancy improved Fully redundant server configuration 2nd server: “near real time” mirroring - “hot swap” Several performance problems Software reached limit for some types of updates Sub-optimal use of hardware by the software –Hardware tuned to the maximum –DB software tweaked –New performance features added

18 RIPE 34 PlenaryMirjam Kühne 18 RIPE Database (2) Database Consistency Project –good results (http://www.ripe.net/db/state/) Secondary Sites –rpsl, test, beta Re-implementation slightly delayed PGP Deployment –80 maintainer objects using PGP

19 RIPE 34 PlenaryMirjam Kühne 19 Test-Traffic Measurements Membership service in 2000 43 sites participating, 36 taking data Data analysis in progress New services being developed: –Delay alarms: small scale tests –Trends in the data: analysis in progress –Results overview page: work starts after RIPE-34

20 RIPE 34 PlenaryMirjam Kühne 20 Where are the test-boxes located?

21 RIPE 34 PlenaryMirjam Kühne 21 Routing Information Service RIS collects and stores Routing information Usage possibilities –Debugging/Problem solving –Statistics –Compare announced against actual policies Prototype setup, used for design studies Design document discussed in Routing-WG –Published early October (ripe-200)

22 RIPE 34 PlenaryMirjam Kühne 22 RR Consistency Consistency between RR & ‘Reality’ Use RIS data collection Concentrate on route/origin authentication RIPE community co-operation –DB-WG, Routing-WG

23 RIPE 34 PlenaryMirjam Kühne 23 RIR coordination Excellent cooperation - IPv6 ICANN & ASO DB consistency We welcome APNIC staff

24 RIPE 34 PlenaryMirjam Kühne 24 Annual General Meeting RIPE NCC AGM: 19.10.1999 –Members register now Agenda –AP2000 –Budget –EB elections

25 Mirjam Kühne 25 RIPE 34, September 1999 Questions and Answers http://www.ripe.net/meetings/ripe/ripe-34pres/


Download ppt "Mirjam Kühne 1 RIPE 34, September 1999 RIPE NCC Status RIPE NCC Staff presented by Mirjam Kühne."

Similar presentations


Ads by Google