Download presentation
1
ENGINEERING, SUPPLY & CONSTRUCTION COMPANY
PT. ESTU ARTHA LANCAR ENGINEERING, SUPPLY & CONSTRUCTION COMPANY
2
COMPANY PT. Estu Artha Lancar
4/8/2017 COMPANY Company Name : PT. Estu Artha Lancar Head Office : Jl. Bangka I no. 4A Lt.2, Pela Mampang, Jakarta Selatan, Indonesia, 12720 Phone : (62.21) Fax : (62.21) PT. ESTU ARTHA LANCAR PT. ESTU ARTHA LANCAR
3
COMPANY REGISTRATION Akte Pendirian Akte Perubahan Pengesahan SIUP
Nomor : 102 Tanggal : 16 April 1993 Notaris : Ny. SP Henny Shidky SH Akte Perubahan Nomor : 3 Tanggal : 11 Oktober 2006 Notaris : Hj. Suzie FH. Tadjoedin SH Pengesahan Nomor : W HT – th 2007 Tanggal : 07 Juni 2007 Instansi : Dept, Hukum dan HAM SIUP Nomor : / Tanggal : 27 Februari 2007 Instansi : Dinas Perindag Pemda DKI Jakarta NPWP Nomor : PT. ESTU ARTHA LANCAR
4
MANAGEMENT UTORO WREKSOATMODJO, SE IR. EMIL JUDO RAHARDJO
COMMISSIONER UTORO WREKSOATMODJO, SE PRESIDENT DIRECTOR IR. EMIL JUDO RAHARDJO DIRECTOR NOVITA WREKSOATMODJO, SE PT. ESTU ARTHA LANCAR
5
ENGINEERS PROCESS ENGINEER 2 person(s) PIPING & MECHANICAL ENGINEER
CIVIL ENGINEER 4 person(s) PIPELINE ENGINEER 2 person(s) HSE ENGINEER 1 person(s) ELECTRICAL & INSTRUMENTATION ENGINEER 3 person(s) TELECOMMUNICATION ENGINEER 1 person(s) QA/QC ENGINEER 1 person(s) CONSTRUCTION ENGINEER 2 person(s) CONTRACT ADMIN & PROGRESS 2 person(s) PT. ESTU ARTHA LANCAR
6
EXPERIENCES ENGINEERING (2006 – 2007) OFFSTAKE STATION INSTALLATION
PERUSAHAAN GAS NEGARA SOUTH SUMATRA – WEST JAVA 4 PIPELINE ONSHORE PROJECT, 32 KM 24” GAS ONSHORE PIPELINE, MUARA BEKASI TO RAWA MAJU (2007) LPG PLAN FLOW LINE SYSTEM PHASE 1, GRESIK LPG TANK & LOADING SYSTEM PHASE 1, GRESIK (2007 – ONGOING) EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. STYRINDO MONO INDONESIA, CILEGON TTU TUBAN PERTAMINA PROJECT, 120 KM 18” FUEL ONSHORE PIPELINE, TUBAN TO SURABAYA (2008 – ONGOING) KAMBUNA ONSHORE PIPELINE AND MODULE-1 ONSHORE RECEIVING FACILITIES GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE PROJECT PT. ESTU ARTHA LANCAR
7
EXPERIENCES SUPPLY CONSTRUCTION (2007)
LPG PLAN FLOW LINE SYSTEM PHASE 1, GRESIK LPG TANK & LOADING SYSTEM PHASE 2, GRESIK (2008) PT. STYRINDO MONO INDONESIA’s Y-STRAINER(s) CONSTRUCTION ( ONGOING) LPG TANK & LOADING SYSTEM PHASE 1, GRESIK PT. ESTU ARTHA LANCAR
8
PROJECT PROFILE Project Title : “OFFTAKE STASION INSTALLATION”
The custody transfer station for gas supplies from TGI (Transgasindo) into PGN Natural Gas Riau Distribution Network. ESTU provides the following services : Project Management Detailed Design Construction Commissioning As-built Hand over Documentation Profile : Fiscal Metering Station included : First Filtration, Inlet Filters, Meters (Ultrasonic), Chromatographs, Analyzers, Control Valves, Regulators, Odorize, Corrosion Inhibitor, Process Pipe work, Venting Pipe work, Instrumentation and Controls, Scada, Switchboards, Diesel Generators, and Transformers. Buildings included : Administration, Control Room, Fire Station, Utilities, Metering Shelter, Analyzer Shelter and Guard House. Capacity : Up to 150 MMSCFD Client : PT. YUAN SEJATI PT. ESTU ARTHA LANCAR
9
PROJECT PROFILE Project Title : “LPG PLANT FLOW LINE SYSTEM PHASE 1”
The Network. ESTU provides the following services : Project Management Detailed Design Procurement / Material Supplies Construction Commissioning As-built Hand over Documentation Profile : Fiscal Metering Station included : First Filtration, Inlet Filters, Meters (Orifice), Chromatographs, Analyzers, Control Valves, Regulators, Process Pipe work, Venting Pipe work, Instrumentation and Controls Capacity : Up to 40 MMSCFD Client : PT. MEDIA KARYA SENTOSA PT. ESTU ARTHA LANCAR
10
PROJECT PROFILE Project Title : “LPG TANK & LOADING SYSTEM PHASE 1”
The Network. ESTU provides the following services : Project Management Detailed Design Procurement/ Material Supplies Construction Commissioning As-built Hand over Documentation Profile : Fiscal Metering Station included : Tank System, Flare Header System including Flare Sub-system, Loiading Facilities, Flare Stack, Tank gauging System, Pump Syatem, Instrumentation and Control System Capacity : Up to 40 MMSCFD Client : PT. MEDIA KARYA SENTOSA PT. ESTU ARTHA LANCAR
11
PROJECT PROFILE Project Title : “SOUTH SUMATRA – WEST JAVA GAS PIPELINE ONSHORE PROJECT” PERUSAHAAN GAS NEGARA SOUTH SUMATRA – WEST JAVA GAS PIPELINE ONSHORE PROJECT, 30 KM 32” GAS ONSHORE PIPELINE, MUARA BEKASI TO RAWA MAJU. ESTU provides the following services : Detailed Design Procurement Assistance Construction Engineering As-built Hand over Documentation Profile : Pipeline included : Pipeline Detailed Engineering consists of: 4 Block Valve Station, River and Road Crossings, Anchor Blocks, Cathodic Protection System Capacity : Up to 400 MMSCFD Gas Client : PT. CITRA PANJI MANUNGGAL PT. ESTU ARTHA LANCAR
12
PROJECT PROFILE Project Title : “EHTYLENE GAS RECEIVING SYSTEM PROJECT” EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. STYRINDO MONO INDONESIA, CILEGON ESTU provides the following services : Detailed Design Procurement Assistance Construction Engineering Commissioning As-built Hand over Documentation Fitting Supplies (Variation Order) Profile : Compressor included : Comppressor Units, First Filtration, Inlet Filters, Coriolis Meters, Chromatographs, Analyzers, Control Valves, Regulators, Process Pipe work, Venting Pipe work, Instrumentation and Controls. Capacity : Up to 45 Psi of Ethylene Gas Client : PT. CITRA PANJI MANUNGGAL PT. ESTU ARTHA LANCAR
13
PROJECT PROFILE Project Title : “TTU TUBAN PERTAMINA PROJECT”
TTU TUBAN PERTAMINA PROJECT, 136 KM 16” FUEL ONSHORE PIPELINE, TUBAN TO SURABAYA ESTU provides the following services : Detailed Design Project Management Procurement Assistance Construction Engineering As-built Hand over Documentation Profile : Pipeline included : Pipeline Detailed Design consists of: 2 HDD, 13 Block Valve, Road and River Crossings, Swamp Area, Anchor Blocks, Cathodic protection System Capacity : 15,000 barrel / day Client : PT. CITRA PANJI MANUNGGAL for PERTAMINA PT. ESTU ARTHA LANCAR
14
PROJECT PROFILE Project Title : “KAMBUNA ONSHORE PIPELINE AND
MODULE-1 ONSHORE RECEIVING FACILITIES” KAMBUNA PROJECT, 57 KM OFFSHORE TO ONSHORE PIPELINE, GELAGAH KAMBUNA ESTU provides the following services : Electrical and Instrumentation Detailed Design Hand over Documentation Profile : Electrical and Insturmentation included : Pressure Transmitter, Pressure Indicator, Temperature Transmitter, Temperature Indicator, Pressure Control Valve, Silenoid Valve, Pressure Safety Valve, Corrosion Coupon, Corrosion Probe, Pig Signal, Electrical Grounding, Electrical Lighting, Tubing Layout. Client : PT. CITRA PANJI MANUNGGAL for ASIA PETROLEUM DEVELOPMENT PT. ESTU ARTHA LANCAR
15
PROJECT PROFILE Project Title : “GUNUNG MEGANG SINGA GAS BOOSTER
PIPELINE PROJECT” GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE PROJECT, 17,5 KM ONSHORE. ESTU provides the following services : Detailed Design Procurement Assistance Construction Engineering As-built Hand over Documentation Profile : Compressor and Pipeline included : Comppressor Units, Control Valves, Process, Pipeline Detailed Design, Instrumentation and Controls, Electrical and Civil Works. Client : PT. CITRA PANJI MANUNGGAL for MEDCO ENERGY PT. ESTU ARTHA LANCAR
16
PROJECT PROFILE Project Title : “PROJECT MANAGEMENT – TTU TUBAN”
TTU TUBAN PERTAMINA PROJECT, 136 KM 16” FUEL ONSHORE PIPELINE, TUBAN TO SURABAYA ESTU provides the following services : ManPower Supplies Client : PT. CITRA PANJI MANUNGGAL for PERTAMINA PT. ESTU ARTHA LANCAR
17
PROJECT PROFILE Project Title : “PROJECT MANAGEMENT – JAMBI
MERANG PIPELINE PROJECT” JAMBI TO MERANG PIPELINE PROJECT, SUMATRA ESTU provides the following services : ManPower Supplies Client : PT. CITRA PANJI MANUNGGAL for Amerada Hess PT. ESTU ARTHA LANCAR
18
Resources Software PROCESS software Hysis PIPING & MECHANICAL software
Caesar, Pvelite PIPELINE software Autocad PDMS CIVIL software SAP ELECTRICAL & INSTRUMENTATION software Etap, InstruCal PT. ESTU ARTHA LANCAR
19
UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2006 DAN 30 JUNI 2007
FINANCIAL REPORT PT ESTU ARTHA LANCAR LAPORAN LABA RUGI UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2006 DAN 30 JUNI 2007 Cat 2007 2006 PENDAPATAN BEBAN OPERASIONAL 10 11 ( ) ( ) LABA OPERASI PENDAPATAN DAN BEBAN NON OPERASIONAL 12 LABA BERSIH SEBELUM PAJAK TAKSIRAN PAJAK 13 ( ) ( ) LABA BERSIH SETELAH PAJAK PT. ESTU ARTHA LANCAR
20
FINANCIAL REPORT PT ESTU ARTHA LANCAR NERACA
PER 31 DESEMBER 2006 DAN 30 JUNI 2007 AKTIVA CAT 2007 2006 KEWAJIBAN DAN EQUITAS AKTIVA LANCAR Kas dan setara kas Piutang Dagang Proyek dalam pelaksanaan 3 4 5 KEWAJIBAN JANGKA PENDEK Hutang Dagang Hutang Pajak 7 8 Jumlah Aktiva Lancar Jumlah Kewajiban Jangka Pendek AKTIVA TIDAK LANCAR Aktiva Tetap – Nilai Bersih setelah dikurangi penyusutan 6 EQUITAS Modal Saham – Modal Dasar 5000 Rp ditempat dan disetor penuh SALDO LABA 9 Jumlah Aktiva Tidak Lancar Jumlah Ekuitas JUMLAH AKTIVA JUMLAH KEWAJIBAN DAN EQUITAS PT. ESTU ARTHA LANCAR
21
UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2005 DAN 2006
FINANCIAL REPORT PT ESTU ARTHA LANCAR LAPORAN LABA RUGI UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2005 DAN 2006 Cat 2006 2005 PENDAPATAN BEBAN OPERASIONAL 10 11 ( ) ( ) LABA OPERASI PENDAPATAN DAN BEBAN NON OPERASIONAL 12 LABA BERSIH SEBELUM PAJAK TAKSIRAN PAJAK 13 ( ) ( ) LABA BERSIH SETELAH PAJAK PT. ESTU ARTHA LANCAR
22
FINANCIAL REPORT PT ESTU ARTHA LANCAR NERACA
PER 31 DESEMBER 2005 DAN 2006 AKTIVA CAT 2006 2005 KEWAJIBAN DAN EQUITAS AKTIVA LANCAR Kas dan setara kas Piutang Dagang Proyek dalam pelaksanaan 3 4 5 - KEWAJIBAN JANGKA PENDEK Hutang Dagang Hutang Pajak 7 8 Jumlah Aktiva Lancar Jumlah Kewajiban Jangka Pendek AKTIVA TIDAK LANCAR Aktiva Tetap – Nilai Bersih setelah dikurangi penyusutan 6 EQUITAS Modal Saham – Modal Dasar 5000 Rp ditempat dan disetor penuh SALDO LABA 9 Jumlah Aktiva Tidak Lancar Jumlah Ekuitas JUMLAH AKTIVA JUMLAH KEWAJIBAN DAN EQUITAS PT. ESTU ARTHA LANCAR
Similar presentations