Dredging, Infrastructure, and Other Challenges on the Mississippi River System Presented by: Spencer Murphy Vice President – Risk Management Canal Barge Company, Inc. S:\PRESENT\Core Presentations\CBC Presentation_ pptx
2
Agenda Industry Background Canal Barge Company Overview
Infrastructure Challenges Dredging needs Solutions Questions S:\PRESENT\Core Presentations\CBC Presentation_ pptx
3
“Inland Marine Highway”
Pittsburgh Minneapolis St. Paul Chicago Houston Mobile Tulsa New Orleans St. Louis Corpus Christi Portland Over 12,000 miles connecting 38 States 624 million tons of cargo transit the inland waterways 14% of all intercity freight, valued at nearly $70 billion, for only 3% of the total freight bill S:\PRESENT\Core Presentations\CBC Presentation_ pptx
4
Value of Barging Critical to national economic infrastructure – although largely out of public view Offers compelling economic value Boasts excellent safety & environmental record Affords tremendous fuel efficiency Provides positive impact on American quality of life S:\PRESENT\Core Presentations\CBC Presentation_ pptx
5
Dry Cargo Capacity One 15-Barge Tow 216 Rail Cars + 6 Locomotives
1,050 Large Semi Tractor-Trailers 216 Rail Cars + 6 Locomotives The following slides come from a study commissioned by the National Waterways Foundation and prepared by the Texas Transportation Institute that reports on the effectiveness of barging relative to other modes of transportation. This slide relates barge capacity to other modes. As you can see a common 15-barge tow of dry cargo has the equivalent capacity of 216 rail cars and six locomotives, or 1,050 tractor-trailers. Source: Texas Transportation Institute Center for Ports and Waterways, November 2007 5 5
6
Industry Characteristics
24/7/365 operation Service intensive – the customer is with you every step of the way Outdoor sport Competitive Workforce dependent Fascinating and challenging. Very management intensive! S:\PRESENT\Core Presentations\CBC Presentation_ pptx
7
Canal Barge Company S:\PRESENT\Core Presentations\CBC Presentation_ pptx
8
Canal Barge Company, Inc.
Founded in 1933 – 3rd generation family-owned business “Canal” because of original service area We concentrate on areas where specialized knowledge, equipment, focus, and people make a difference. We have built our business by seeking long-term, successful relationships with our customers, suppliers and employees. S:\PRESENT\Core Presentations\CBC Presentation_ pptx 8
9
Canal Barge Company Profile September 7, 2011
4/8/ :21 PM Canal Barge Company Profile September 7, 2011 People 580 non-union Barges 817 Tank barges 213 Deck barges 144 Hopper barges 460 Inland Towboats 32 S:\PRESENT\Core Presentations\CBC Presentation_ pptx
10
CBC Today One of the largest & most diverse privately owned marine transportation companies in the U.S. Third-largest inland liquid carrier for hire World-class manager of third-party marine assets Mid-sized dry cargo logistics manager Dominant liquid carrier into the Midwest markets Only independent towing & fleeting service on the Upper Illinois River Asphalt and chemical terminal operator in Chicagoland Second-largest deck barge fleet for hire Inland, offshore and international project carrier
11
S:\PRESENT\Core Presentations\CBC Presentation_6.22.2011.pptx
12
CBC’s Area of Operations
River SIUT Lower Mississippi & Illinois Rivers 4 CBC boats Chicago River Unit Tows 3 - 5 CBC boats (working throughout Inland Waterways) Ohio River Towing Alliance 3 boats Illinois River & Chicagoland 9 IMT boats Pittsburgh Houston West Canal Gulf Unit Tows Canal SIUT 7 CBC boats 4 boats Baton Rouge Note: Count includes Owned, Operated, & Contracted boats.
13
Infrastructure Challenges
S:\PRESENT\Core Presentations\CBC Presentation_ pptx
14
Infrastructure Challenges
Our lock and dam system is aging More than half the system’s locks are over 50 years old Outdated locks cause inefficiency Modern 1200ft tows must transit 600ft locks As locks age, maintenance costs and downtime for repairs increase Cargo moving through an increasingly expensive system decreases competitiveness for U.S. shippers S:\PRESENT\Core Presentations\CBC Presentation_ pptx
15
Infrastructure Challenges
Our project delivery system for new construction and/or major rehab of locks and dams is broken Operations and Maintenance (O+M) funding for existing projects has remained flat while costs have increased Major new projects have far exceeded their authorized costs, and failed to meet timelines Inland Waterways Trust Fund (IMTF) has been depleted without corresponding completion of projects S:\PRESENT\Core Presentations\CBC Presentation_ pptx
16
Infrastructure Challenges
S:\PRESENT\Core Presentations\CBC Presentation_ pptx
17
Infrastructure Challenges
S:\PRESENT\Core Presentations\CBC Presentation_ pptx
18
Infrastructure Challenges
Solution: Must recapitalize our river infrastructure Barge industry can’t do it alone Capital Development Plan Developed by Corps and Industry Improve project delivery system; prioritize projects Increase in fuel tax on barge industry Adjust cost-share to reflect public benefits of locks and dams Supported by broad coalition of shippers, carriers, ports, labor and agriculture. S:\PRESENT\Core Presentations\CBC Presentation_ pptx
19
Dredging S:\PRESENT\Core Presentations\CBC Presentation_ pptx
20
Dredging Why is dredging the Mississippi River important?
MS River connects over 12,000 miles of inland waterway to the Gulf of Mexico 60% of all U.S. grain exports move on the MS River Between $ billion worth of foreign trade passes through New Orleans ports annually S:\PRESENT\Core Presentations\CBC Presentation_ pptx
21
Dredging Mississippi River requires between $ million annually to maintain 45ft authorized depth Like locks and dams, dredging needs have increased while funding has remained flat. 2011 funds for dredging: $53 million 2011 minimum dredging needs: $85 million S:\PRESENT\Core Presentations\CBC Presentation_ pptx
22
Dredging What happens without adequate dredging?
Draft restrictions below 45 ft 40ft restriction reduces capacity by 12-15% Reduces amount of cargo carried by each vessel call Increases cost of bringing US goods to/from int’l markets Makes US farmers and manufacturers less competitive Drives commerce away from the River U.S. loses its key advantage: low cost transportation of goods to market S:\PRESENT\Core Presentations\CBC Presentation_ pptx
23
Dredging President Obama’s Goal: Double exports over the next 5 years
To achieve this, the Mississippi River must receive adequate investment Key roadblock: Harbor Maintenance Trust Fund carries a surplus of over $5 billion. Money collected specifically for dredging is being put into general treasury of US S:\PRESENT\Core Presentations\CBC Presentation_ pptx
24
Dredging Solution: Realizing America’s Promise Act (RAMP Act)
Would directly tie HMTF appropriations to HMTF revenue. Would address prospective funds only; surplus left in place Supported by broad coalition of shippers, carriers, ports, labor, and industry groups. S:\PRESENT\Core Presentations\CBC Presentation_ pptx
25
Questions? Thank You! 4/8/2017 11:21 PM