2
Sites and Projects Headquarters of DBE and DBE TECHNOLOGY at Peine Site Exploration Mine at Gorleben Konrad Repository at Salzgitter Repository Morsleben at Morsleben Deutsche Gesellschaft zum Bau und Betrieb von Endlagern für Abfallstoffe mbH (DBE)
3
Sites and Projects
4
Regulatory Framework DBE plans, constructs and operates all Federal repositories for radioactive waste on behalf of BfS BfS is the responsible office of the Federal Government for repository construction and operation The Federal Government shall provide repositories for radioactive waste disposal (§ 9a, Abs. 3, Atomic Energy Act)
5
Shareholders Babcock Noell Nuklear GmbH, Würzburg (25%) GNS Gesellschaft für Nuklear-Service mbH, Essen (75%)
6
Milestones Gorleben Site Exploration MineMorsleben Repository Konrad Repository
7
DBE Peine
8
DBE TECHNOLOGY GmbH
9
Gorleben – Site Exploration Mine
10
Gorleben - Milestones
11
Gorleben – Site Exploration
12
EB 1 EB 3 EB 5 EB 7 EB 9 Gorleben – Geological Model
13
Gorleben – Underground Facilities 7 km Drifts 11 km Boreholes
14
Gorleben – Salt Dome Cross-Section z2 z4 z3 z2 z3 z4 z1 Bornemann 1987 EB 1
15
Gorleben - Geological Section EB1 z2 z3 z3 HA z3
16
Gorleben - Underground
17
Konrad
18
Konrad – Milestones
19
Konrad – Vertical Cross-Section
20
Konrad – Iron Ore Deposits near Salzgitter
21
Konrad – Underground Facilities 40 km Drifts Shaft 2
22
Konrad - Equipment
23
Konrad – Disposal Sequence
24
Konrad – Shaft 1 Facilities
25
Konrad – Shaft 2 Facilities
26
Morsleben – Radioactive Waste Repository
27
Morsleben – Milestones
28
Morsleben – Geological Cross-Section
29
Morsleben – Salt Deposit Quelle: BfS
30
Morsleben – Waste Disposal Eastern Field Central AreaEastern Field
31
Morsleben – Waste Disposal Western Field
32
Morsleben – Repository Mine with Central Area Backfilling Volume: Central Area:670.000 m³ Bartensleben:3,7 Mio m³ Marie:0,8 Mio m³ Zentralteil
33
Richard Access Tunnel
34
Waste Disposal at Richard
35
Richard Enhanced Closure Solution
36
Richard Chamber 8/2
37
Chamber Preparation Gravel layer Drainag e pipe Shotcrete reinforcemen t Pipe for monitoring cables Steel mesh with gauze
38
Chamber Construction