1
T-76.4115 Iteration Demo Tempus PP-Iteration 17.10.2005
2
T-76.4115 Iteration demo 2 Agenda Project status (15 min) achieving the goals of the iteration Timeline mostly met Core use cases defined Documentation available Tools in use (Wiki, Dotproject) Project group formed and responsibilities and main roles defined Project architechture Development environment mostly defined project metrics Timeline Reported working hours Work results (10 min) presenting the iteration’s results Documentation Use cases Research Technologies Used work practices (10 min)
3
T-76.4115 Iteration demo 3 Introduction to the project What is this project about? The main goal of this project is to develop, test, document and deliver a SIP- based calendar solution for the customer, Nokia Research Center. Developed by extending the open source Mozilla Calendar Project Design is based on IEFT SIP calendaring event draft, which will most likely be revised as the project progresses.
4
T-76.4115 Iteration demo 4 Status of the iteration’s goals Define the main roles of the project group ok Understand the domain, especially SIP and network calendaring ok Understand the goals of the project ok Define the core requirements on a high level ok Perform as much additional requirements work as possible Not much achieved Plan and set up the process infrastructure such as working and communication methods Mostly ok Set up the technical infrastructure such as servers and software tools ok
5
T-76.4115 Iteration demo 5 Status of the iteration’s deliverables Project plan OK Requirements document Only contains proposed core requirements Quality handbook Ok for this iteration, still needs work Risk Management Plan Ok for this iteration, ongoing process
6
T-76.4115 Iteration demo 6 Realization of the tasks Team StatusRealPlanDiff(Left) Project planLauri Pitkänen, Juha Vuojärvi and Janne Koilo OK 2638-12 Requirements specificationAllOK 1524-9 Risk management planLauri Pitkänen, Juha Vuojärvi and Janne Koilo OK 1815+3 Course lecturesAllOK 3450-16 Personal SEPA practicesAllOn-going or not started 1030-20 Progress reportLauri PitkänenOK 23 Reporting and correspondence AllOngoing 2050-30 Meetings and meeting kick off AllOK, not yet held 2548-2318 Project infrastructure set- up Sakari LaitinenOK 2421+34 Quality handbookJuha Vuojärvi, Lauri PitkänenOK 120+12 ResearchJanne Koilo and developersOK 3050-20 Total 216329-11322
7
T-76.4115 Iteration demo 7 Working hours by person Reporting problems with the Dotproject system may have lost hours. This is being worked on. Person RealPlanDiff Sakari Laitinen 2540-15 Lauri Pitkänen 4956-7 Janne Koilo 50 0 Juha Vuojärvi 3253-21 Annu Myllyniemi 1126-15 Anu Markkola 1326-13 Herman-Filip Björklund 1226-14 Juha Koponen 1226-14 Paula Hellemaa 1226-14 Total 216329-113 Realized hours in this iteration
8
T-76.4115 Iteration demo 8 Quality assessment Functional areaCoverageQualityComments Project Plan2 Reviewed and accepted Requirements1 Not reviewed properly SEPA1 Not really started Quality Handbook1 Still needs work Legend Coverage: 0 = nothing 1 = we looked at it 2 = we checked all functions 3 = it’s tested Quality: = quality is good = not sure = quality is bad