STATE RADIO IP TRANSITION Project Overview Travis Durick 12/5/2012
2
Deploying Zetron MAX Dispatch system Two cores for redundancy – One in Bismarck – One in another city IMPLEMENTATION
3
Migrating current TDM-T1 circuits to IP based circuits – “IP to the Tower” Taking place incrementally – First terminate T1’s to IP gateways in State radio IMPLEMENTATION
4
Utilize RoIP gateway to convert 3 or 4 wire to IP IMPLEMENTATION
5
State Radio DCN T1 BASED DESIGN Fargo Grand Forks Minot
6
Fargo State Radio STAGEnet VIPER Backup Site VIPER Backup MAX Dispatch Bismarck Grand Forks Minot IP BASED DESIGN
7
Bismarck 911 Origination Fargo STAGEnet Backup Grand Forks Minot RADIO + ESINET PSAP3 PSAP2 PSAP 1 State Radio
8
Add a radio channel from a City/County Give State Radio ability to listen and talk on the channel Transport radio over STAGEnet without any additional circuits P.O.C.