1 BELAWAN PORT DEVELOPMENT PROJECT
November 2008

2 GENERAL CONDITION LOCATION
This port is very strategic because it is located in the international shipping lane and geographically it’s position in : 03 – 43’ – 00’ LU North Latitude 98 – 42’ – 08’ BT East Longitude Belawan Container Terminal is located at the mouth of Belawan River and Deli River with shipping channel that measures 13,5 km in length connecting the port to the sea in Malacca straits. The port is around 30 km away from Medan, the capital of North Sumatra province, with total area m2 Gabion Belawan Container Terminal Situated at the north east of Sumatera island which located approximately 27 km from the centre of Medan, the provincial capital of North Sumatera facing. Malacca Strait, the port of Belawan has steadily grown and become the largest port in Sumatera and the third largest port in Indonesia after Tanjung Priok port in Jakarta and Tanjung Perak port in Surabaya. The port is an integrated international port handling all types of cargo (general cargo, container, bulk etc). Gabion Belawan Container Terminal is the biggest Container Terminal located at Belawan port. In term of total cargo throughput in 2007 GBCT handled TEUS,

3 GENERAL CONDITION ACCESS CHANNEL

4 GENERAL CONDITION EXISTING Pertamina Jetty kapasitas : 17.000 DWT
Container Terminal Tambatan : M’ - Kedalaman : Mlws - C Y : M2 Yards : M2 C F S : M2 Belawan Lama - Tambatan : M’ - Kedalaman : Mlws Passenger Terminal - Internasional : pax - Domestik : pax Citra - Tambatan : M’ M’ Kedalaman : Mlws - Gudang : 3 Unit Ujung Baru - Tambatan : 1,670 M - Kedalaman : Mlws Pertamina Jetty kapasitas : DWT

5 OPERATION SHIP CALL

6 OPERATION LOADING / UNLOADING

7 OPERATION CONTAINER TRAFFIC

8 PORT DEVELOPMENT CARGO FORECAST

9 GABION BELAWAN CONTAINER TERMINAL
3

10 FACILITIES 4 INTERNATIONAL DOMESTIC Berth 500 m 350 m
SHIP SERVICES FACILITY INTERNATIONAL DOMESTIC Berth m m Basin Area : m2 Depth : 8-10 M.L.W.S CARGO HANDLING FACILITY INTERNATIONAL DOMESTIC Container Yard m m2 REEFER PLUGS : Points 4

11 PORT DEVELOPMENT BELAWAN MASTER PLAN

12 PORT DEVELOPMENT PHASE SHORT TERM (2008-2012) MEDIUM TERM (2013-2022)
LONG TERM ( ) HUB PORT SCENARIO

13 DEVELOPMENT BACKGROUND
Utilizing the Competitive Advantage (Geografic and Hinterland) Developing to be the hub port Growing of container throughput Anticipating the trend of containerization 12

14 PROJECT PROFILE Name of project : Belawan Port short term Development Project Project cost : US$ ,83 Stage 1 : US$ ,09 consisting of Under IDB Financing 82,28% Under GOI Financing 17,89% Stage 2 : US$ ,69 consisting of Under IDB Financing 79,27% Under GOI Financing 20,78% Executing agency : Ministry of Transportation Location : Belawan, Nort Sumatera Province Project period : 6 (six) years, comprise of ; Stage 1 : 3 (three) years Stage 2 : 3 (three) yaers 13

15 PHASE OF GBCT DEVELOPMENT PROGRAM
14

16 GBCT FIRST EXTENSION PROJECT ESTIMATION COST STAGE-I
No Description Amount (US$) Equipment Gantry crane ,39 Transtainer ,19 Trailer ,94 Chassis ,13 Reach stacker ,69 Civil Work Dredging ,84 Reclamation ,45 Revertment ,709,68 Soil improvement ,84 Container yard ,24 Container wharf-14 mlws ,03 Drainage Road ,54 Utility ,65 Engineering cost ,37 Contigency ,49 Value added Tax ,75 Total ,09 15

17 GBCT FIRST EXTENSION PROJECT ESTIMATION COST STAGE-II
No Description Amount (US$) Equipment Gantry crane ,39 Transtainer ,19 Trailer ,94 Chassis ,13 Reach stacker Civil Work Dredging ,84 Reclamation ,45 Revertment ,709,68 Soil improvement ,84 Container yard ,24 Container wharf-14 mlws ,03 Drainage Road ,54 Utility ,65 Engineering cost ,74 Contigency ,74 Value added Tax ,48 Total ,74 16

18 THANK YOU