Jenis dan Metoda Instalasi Tiang
Pintor T. Simatupang, Ir., MT., Dr. Eng
2
Penggunaan Pondasi Tiang
3
Jenis Tiang Tiang baja Tiang beton Tiang kayu Tiang komposit
4
Tiang Baja
5
Tiang Baja
6
Tiang Baja
7
Tiang Baja
8
Tiang Baja
9
Tiang Beton Precast piles Cast-in-situ pile Dengan casing Tanpa casing
10
Precast Piles
11
Precast Piles
12
Precast Piles
13
Precast Piles
14
Presstreed Concrete Piles
15
Presstreed Concrete Piles
16
Lempeng logam dengan baut
Tiang Kayu Sambungan tiang kayu Tiang klas A Tiang klas B Tiang klas C Selubunga pipa Lempeng logam dengan baut
17
Tiang Kayu
18
Tiang Screw
20
Pemancangan Tiang Palu jatuh
21
Pemancangan Tiang Tenaga uap atau udara Single acting
22
Pemancangan Tiang Tenaga uap atau udara Double acting
23
Pemancangan Tiang Diesel
24
Pemancangan Tiang
26
Pemancangan Tiang Vibrator
27
Pemancangan Tiang Vibrator
28
Pemancangan Tiang Vibrator
29
Cast in place Dengan casing Raymond Step-Taper Monotube (Union Metal)
Western Dengan casing Tanpa casing Pipa seamless (Armco)
31
Cast in place Dengan casing Franki dengan casing dan pedestal Western
tanpa casing Tanpa casing Franki tanpa casing dan pedestal
33
Pelaksanaan Bored Pile
34
Pelaksanaan Bored Pile
35
Pelaksanaan Bored Pile
36
Slurry Method
37
Casing Method
39
Method Statement of Bored Pile
Bored Piling Method of Works Method Statement of Bored Pile Casing Installation Drilling Process Cleaning at Final Depth Reinforcement Installation Temporary Casing Removal Pouring Concrete
40
Drilling tools Auger Cleaning bucket Drill Bucket Underreamer
Drilling tools to be used for each drilling are different pending on the soil characteristic. Auger are used for drilling on a dry material As soon as ground water is found then drill bucket are used. Rock material can be drilled by using core barrel or rock auger and if it is very hard then roller bit core barrel shall be used. Upon completion of drilling which will be performed by any of above tools, the cleaning bucket will be used to clean the bottom of the piles to unsure that the pile is properly clean and no settlement could occur. In several project bottom bell are designed by consultant, tool for this is also available ( under reamer ), however the result is very difficult to prove since usually soil will collapse and nothing can be checked on the result. Underreamer Tapered rock auger Round shank Core Barrel Roller bit core barrel
43
Sambungan Tiang Pancang
44
Sambungan Tiang Pancang
45
Final Set = ? In/10 blows Spesifikasi end bearing = 1 in/ 10 blows
47
DSep DSpp P t d t q q DSes DSo d
48
DSep DSpp P t d t q q DSes DSo d