Presentation is loading. Please wait.

Presentation is loading. Please wait.

Team: Justin Dick, Ngon Du, Lassen Loop, & Travis Taylor Sponsor: Idaho Dept. of Fish and Game/Land Owners Advisors: Dr. Brian Johnson & Dr. Richard Wall.

Similar presentations


Presentation on theme: "Team: Justin Dick, Ngon Du, Lassen Loop, & Travis Taylor Sponsor: Idaho Dept. of Fish and Game/Land Owners Advisors: Dr. Brian Johnson & Dr. Richard Wall."— Presentation transcript:

1 Team: Justin Dick, Ngon Du, Lassen Loop, & Travis Taylor Sponsor: Idaho Dept. of Fish and Game/Land Owners Advisors: Dr. Brian Johnson & Dr. Richard Wall

2 OUTLINE System Overview Project Specifications Design Review Budget Schedule Questions

3 System Overview

4

5 Project Specs: Interface User selected time operation time. Wireless sensors-cannon communications.

6 Project Specs: Operation 2 week+ battery life. Detect Deer and Elk at least 200 feet away from sensors. 300 ft sensor-cannon communication range. Sensors communicate to all cannons in range. Random cannon detonation interval. Operate in a variety of terrains & vegetation.

7 Project Specs: All Weather Withstand temperatures from -10°F to 120°F in direct sunlight. Operate in snow and rain.

8 Project Specs: Size Sensor: Weigh less than 2 lbs. Smaller than 5”x5”x5” (not including mast). Control Unit: Weigh less than 5 lbs Smaller than 10”x10”x5”

9 Project Desirables Interface Network select option. On/Off switch Operation Use existing gas valves with solenoid modification.

10

11 Sensors Completed: Upgraded Whip Antenna Modified NEMA IV Enclosure Sturdy Design Larger and Heavier than Anticipated To Do: Add Power Switch Incorporate Battery Tray Build Remaining Housings

12 Sensor Modification Original Sensor/TX Module Modified Sensor Module Enclosure

13 Wireless Network Topology

14 Solenoid and Valve Completed: Solenoid Operates Valve Controlled with MC via H-Bridge To Do: Test with pressurized line.

15 Receiver & Controller Completed: Toggles Solenoid Accepts Trimpot Input To Do: Add Power Switch Wire to Receiver Add Receiver Input Activation

16 Receiver & Controller Operation Dial Select detonations per sighting. On/Off Switch Channel Select Feature built into Glolabs parts

17 Controller Network Concept 7 I/O pins required for our design

18 Performance 6654 Successful Detonations Equivalent to 554 animal sightings (worst case). Better performance using non-generic batteries Recommend lithium AAs Receiver 1in wider than specified. Still need to calibrate sensors/measure range.

19 Client Questions Detonation vs. Timing Scheme Proof of Concept Using cannon Valve only Valve position / mounting Additional Labeling Mini-expo Nov 30

20

21 ItemTypeQuantityShippingCost Per UnitBudgetedActualAdditional Parts obtained Glolab Sensor & Transmitter KMDT Wireless Motion Detector Transmitter Kit3$15.00$60.00$225.00 Recurring ReceiverKR4B RECEIVER KIT1$9.00$36.00$45.00 Non- recurring ReceiverKR4A RECEIVER KIT1$12.61$51.86$64.47 Recurring AntennaWA4184$5.00$7.00$48.00 Recurring Total $382.47 Digikey H-BridgeL293B2$1.10$4.32$10.84 Recurring Voltage Regulator497-1441-5-ND4$16.40$0.72$19.28 Recurring (1) Battery Holders1295K-ND3$9.20$1.70$14.30 Recurring Trim PotP9A1-50K-ND1$2.20$7.14$9.34 Total $53.76 Parallax ControllerBASIC Stamp 1 Module BS1-IC1$7.00$29.00$36.00 Recurring Development Board/KitBasic Stamp 1 Starter Kit1$8.00$79.00$87.00 Non- recurring Total $115.00 Kim Controls Housing(Sensor/ Transmitter) Nema 4 4x4x3 Enclosure BN4040403CH3$9.00$36.25$135.75 Recurring Housing(Receiver /Controller/Circuit Board) Nema 4 4x4x3 Enclosure BN4040403CH1$9.00$36.25$45.25 Recurring Total $154.44 Solenoid 1$0.00 Total$705.67 Available$1,020.23

22 Remaining Expenses ItemTypeQuantityShippingCost Per UnitBudgetedActualAdditional Parts TBD BatteriesAA's8 $0.50$4.00 Recurring Sensor Battery9-volt3 $0.50$1.50 Recurring Poster Board 1 $75.00 Non- recurring User Manual 1 $20.00 Non- recurring Circuit Board Setup(Dr. Wall)1 $155.00 Non- recurring Total $304.50

23 Overall Budget Total Expected Cost Total Spent$705.67 Available$1020.23 Remaining Budget$314.56 Remaining Expenses$254.50* *May not reflect additional miscellaneous items.

24 Schedule Mid-Semester Hardware Review Oct 25 Design Report Review Nov 12 Design Expo Nov 30 Course Deliverables DueDec10

25 Schedule

26 Contact: deads@uidaho.edu Home Page: http://seniordesign.engr.uidaho.edu/2006_2007/deads/


Download ppt "Team: Justin Dick, Ngon Du, Lassen Loop, & Travis Taylor Sponsor: Idaho Dept. of Fish and Game/Land Owners Advisors: Dr. Brian Johnson & Dr. Richard Wall."

Similar presentations


Ads by Google