Presentation is loading. Please wait.

Presentation is loading. Please wait.

European GNSS Evolution Programme

Similar presentations


Presentation on theme: "European GNSS Evolution Programme"— Presentation transcript:

1 European GNSS Evolution Programme 2013-15
IWG, New Delhi, India, 05 Feb 2014

2 OVERVIEW Initiated 2013 in EGEP EGEP Workplan 2014

3 G2G DEVELOPMENTS STARTED 1
ELECTRICAL PROPULSION SUBSYSTEM INDUSTRIALIZATION AND THRUSTER OPERATIONAL CHARACTERISATION Prerequisite for G2G to keep launch costs of larger platforms in present launch cost envelope E. g. 3 sats in Soyuz ST or 1 sat in VEGA Transfer time of 12 months requires new launch strategy First contract kicked-off Dec. 2013, second one follows in Feb. 2014

4 G2G DEVELOPMENTS STARTED 2
GALILEO 2nd GENERATION SPACE SEGMENT PHASE A/B1 Follows Galileo-1 after 2021 Flexibility to replenish in different planes w/ one single launch Increasing Galileo payload capability (ISL, increased signal power levels, upgraded PRS, more robustness, etc.) Two parallel contracts kicked off in Dec. 2013, third one follows

5 G2G DEVELOPMENTS STARTED 3
INTER-SATELLITE LINK PRE-DEVELOPMENT Improved Security Less dependence on ground segment Lower number of GDDN connections Improved command capabilities within seconds Improved Accuracy Performance Smaller ODTS UERE, faster convergence after maneuvers, improves integrity/RAIM, AUTONAV Additional Benefits Sounding of atmosphere Activity kicked off in Dec. 2013

6 G2G DEVELOPMENTS STARTED 4
G2G SUPPORTING ACTIVITIES Development of Advanced Multi constellation Signal & Interference Testbed Enhancement of Orbit Determination & Time Synchronisation PRS Signal Robustness KO in Sept 2013, currently at PDR ODTS using ISL and G1G lessons learnt Negotiations w/ selected bidder presently Improved PRS (classified activity) Evaluation presently going-on

7 G2G DEVELOPMENTS STARTED 5
CLOCK DEVELOPMENTS Miniaturized low-maintenance PHM Robust RAFS Caesium clock Ends Q2/2014 (cont’d in 2014) Ends Q2 /2014 (cont’d in 2014) Finished Q4/2013 (cont’d in 2014)

8 G2G DEVELOPMENTS STARTED 6
G2G SYSTEM ENGINEERING STARTED Joint G2G System Engineering Office established System Support from Industry under negotiation

9 EGNOS NEXT GENERATION V3 1
EGNOS V3 Phase A/B1/B2 (2 parallel contracts) RIMS V3 Prototype ARAIM Thales-F: Phase B2 started Astrium-D: Phase B2 starts end of Jan. 2014 Proposals presently evaluated / clarified Parallel activities w/ IFEN and GMV Skysoft end Q1/2014

10 EGNOS NEXT GENERATION V3 2
SUPPORTING ACTIVITIES Standardization Ionosphere characterization Two parallel Testbeds on V3 Integrity Q1/2014 KO Jan 2014 HISTB KO Jan 2014 NISTB KO Jan 2014

11 AO SCIENCE & TECHNOLOGY
Scientific applications of Galileo (GNSS) and EGNOS Innovative proposals on technology for the evolution of Galileo and EGNOS Two step procedure: First extended abstracts, then pre-selection of invited bidders and submission of full proposals Submitted abstracts: 29 science, 41 technology Pre-selection took place Requests for full proposals in preparation

12 EGEP WORKPLAN 2014 EGNOS NEXT GENERATION V3
Continuation of EGNOS V3 Testbeds (Part 3) - HISTB Q3/2014 - NISTB Q3/2014 GALILEO NEXT GENERATION (G2G) • On-board Clock Ensemble CMCU new • Miniaturised low-maintenance PHM (cont’d) • ARAIM Detailed Threat Allocation and Barriers Q2/2014 • Next Generation Signal Generator (cont’d for PRS) • Robust RAFS (cont’d) • On-board Caesium Clock Design Consolidation • Ground Caesium Development Prop. under evaluation • 2nd Call AO Science and Technology Q2/2014


Download ppt "European GNSS Evolution Programme"

Similar presentations


Ads by Google