Presentation is loading. Please wait.

Presentation is loading. Please wait.

CONCERTO; Milton Keynes Sustainable Residential Quarter

Similar presentations


Presentation on theme: "CONCERTO; Milton Keynes Sustainable Residential Quarter"— Presentation transcript:

1 CONCERTO; Milton Keynes Sustainable Residential Quarter
Jon Muncaster (English Partnerships) cRRescendo City Coordinator Concerto is co-funded by the European Commission cRRescendo is a project of the concerto initiative co-funded by the European Commission under the Sixth Framework Programme

2 cRRescendo; Milton Keynes Partners
English Partnerships Milton Keynes Council Environmental Change Institute, Oxford University Milton Keynes Energy Agency / NEF Arup Associate Community - Northampton

3 cRRescendo; Milton Keynes Location

4 cRRescendo; Milton Keynes Site Aerial: 3D

5 cRRescendo; Milton Keynes Proposed Project Features
EC CLASSIFICATIONS RUE (Rational Use of Energy) RES (Renewable Energy Systems) Poly-generation SAVINGS (in bid): C % Energy 38%

6 cRRescendo; Milton Keynes Proposed Project Features
1. RUE (Rational Use of Energy) Eco building construction - Super insulation - High thermal mass - Air tight construction - Triple glazing, special glass, sun spaces Water efficiency Heat recovery and ventilation systems Combined Heat and Power

7 cRRescendo; Milton Keynes Proposed Project Features
2. RES (Renewable Energy Systems) PV - 20% roof area Ground source heat pumps (GSHP) Phase 2 CHP; biomass plant and boilers (planned) Wind (micro-generation) possible

8 cRRescendo; Milton Keynes Proposed Project Features
3. Poly-generation Combined Heat and Power - Phase 1: Gas fired community heating/cooling - Phase 2: Biomass (planned) Private Wire / Island Mode RES (Renewable Energy Systems) Intelligent Management Systems (IMS)

9 cRRescendo; Milton Keynes Current Position
CHP Phase 1; complete, commissioned. CHP; service contracts to developments. CHP Phase 2; (incl. Biomass); under negotiation. B4 Phase 1; (650 homes); developer selected, planning application October 2007. B4 Phase ; 1 site preparation complete. First School; design stage advanced, planning application October 2007. Research, Training and Dissemination; activities started. Overall; technical and programme review

10 cRRescendo; Milton Keynes Construction Progress 301106
CHP Phase 1

11 cRRescendo; Milton Keynes Concerto Site B4 Ph. 1 & School

12 cRRescendo; Milton Keynes B4 Phase 1 Proposal

13 cRRescendo; Milton Keynes B4 Phase 1 Proposal

14 cRRescendo; Milton Keynes B4 Phase 1 Energy Proposals
Type Target Kg CO2/m2/an Design Improvement % Studio 25.65 9.83 62% 2 - Person 19.77 9.29 53% 4 - Person 17.20 8.24 52% 5 - Person 18.02 8.00 56% 6 - Person 20.07 9.71

15 cRRescendo; Milton Keynes First School

16 cRRescendo; Milton Keynes Cooperation Across The 4 Cities
RESEARCH TRAINING DISSEMINATION Study Trip to Netherlands July 2007

17 English Partnerships The National Regeneration Agency
Concerto is co-funded by the European Commission cRRescendo is a project of the concerto initiative co-funded by the European Commission under the Sixth Framework Programme


Download ppt "CONCERTO; Milton Keynes Sustainable Residential Quarter"

Similar presentations


Ads by Google