Download presentation
Presentation is loading. Please wait.
Published byCortez Marre Modified over 9 years ago
1
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception (TDD) (S4.03 System level protocol aspect) to be discussed at joint meeting S4.11 Basestation conformance testing (FDD) S4.12 Basestation conformance testing (TDD) S4.13 Basestation EMC R4.01 RF System scenarios Tdoc TSG R1#1(99)022 Tdoc TSG R4#1(99) 017
2
R4.00 Introduction Scope –This document introduces the specifications and technical reports written and maintained by RAN WG 4. It will contain the workplan in a temporary chapter. Editor –Mr Takami, DoCoMo
3
S4.01 Radio transmission and reception (FDD) Scope –This document establishes the minimum RF characteristics of the FDD mode of UTRA. Editor –Mr Fernandes, Motorola –Mr Skold, Ericsson
4
S4.02 Radio transmission and reception (TDD) Scope –This document establishes the minimum RF characteristics of the TDD mode of UTRA. Editor –Awaiting confirmation from candidate
5
S4.03 System level protocol aspect Scope Editor –Awaiting confirmation from candidate
6
S4.11 Base station conformance testing (FDD) Scope –Measurement methods for the RF requirements –Measurements for protocols –Approval criteria –Reporting practices –environmental tests Editor –Awaiting confirmation from candidate
7
S4.12 Base station conformance testing (TDD) Scope –Measurement methods for the RF requirements –Measurements for protocols –Approval criteria –Reporting practices –environmental tests Editor –Awaiting confirmation from candidate
8
S4.13 Basestation EMC Scope –This document defines EMC conformance requirements for the basestation necessary to meet relevant EMC regulations Editor
9
R4.01 RF System scenarios Scope –During the UTRA standards development, the physical layer parameters will be decided using system scenarios, together with implementation issues, reflecting the environments that UTRA will be designed to operate in. Editor –Awaiting confirmation from candidate
10
Meeting Schedule RAN WG 4, 15 - 19 Feb 99, Turin RAN 1 - 4 March 99, Dallas RAN WG 4, 22 - 26 March, host required (Japan)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.