Presentation is loading. Please wait.

Presentation is loading. Please wait.

IGSS Step 1: Object type Step 4: Choose symbol Step 2: Data Management Step 3: PLC addressing Object Wizards.

Similar presentations


Presentation on theme: "IGSS Step 1: Object type Step 4: Choose symbol Step 2: Data Management Step 3: PLC addressing Object Wizards."— Presentation transcript:

1 IGSS Step 1: Object type Step 4: Choose symbol Step 2: Data Management Step 3: PLC addressing Object Wizards

2 IGSS Step 1: Choose background color Step 3:Import graphics Step 2: Draw static objects Step 4: Add process components Creating Diagrams

3 IGSS Animated Symbols

4 IGSS Sub-diagrams Sub-diagrams can be part of another diagram You can have multiple sub- diagrams in a diagram

5 IGSS Grids

6 IGSS Pop-up Diagrams Build Libraries Of Group Objects Addresses Alarms Symbols Drawings Reports Scripts Etc.

7 IGSS Standard reports – no programming

8 IGSS Inter/Intranet reports DAY WEEK MONTH QUARTERLY YEARLY SNAPSHOT ALARMS STATISTICS

9 IGSS Advanced graph system Zoom Combine trend and historical data Able to handle huge amounts of data Store graph 10 objects per graph window On-the-fly graph definition

10 IGSS New embedded graph type Time plot or XY plot Graphs can be embedded on diagrams Factor and offset can be applied

11 IGSS Object Calculations Analogue og Digital Objects Y1.ActualValue = (Value(Y2)+Value(Y3))/2 (2*SetPoint(Y2)+3*HighAlarm(Y3)) Value(Y1)*17 10*Sin(3*Value(Y2)) + 17 Max(Value(Y2), Value(Y3), Value(Y4)) Etc.

12 IGSS Online Configuration Changes in the configuration can be activated without stopping the data collection.


Download ppt "IGSS Step 1: Object type Step 4: Choose symbol Step 2: Data Management Step 3: PLC addressing Object Wizards."

Similar presentations


Ads by Google