Download presentation
Presentation is loading. Please wait.
Published byRenee Speakes Modified over 10 years ago
1
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN
2
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 2 BACK GROUND Operation at high elevation airports Traffic Increase
3
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 3 Operation At High Elevation Airports General High Elevation Airport: At or above 1500 m (4922 ft) but below 2438 m (8000 ft). In service:12, On construction:3 Very High Elevation Airport: At or above 2438 m (8000 ft). In service:6, On construction:3 Bangda ( 4334m/14220ft ) More coming……
4
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 4 RNP/RNAV WGS-84 is approved to be used in CAAC. RNAV RNP
5
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 5 RNAV/RNP - En route Remote/Oceanic RNP10 South China Sea RNP4 FANS route , Parallel route L888 Y1 Y2 Y3 Busy Area RNAV 2 RNP 2
6
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 6
7
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 7 RNAV - Terminal RNAV1/RNAV2 AC 91-09 June. 2008 Operation Guidance for RNAV1 &RNA2 in Terminal and Enroute Flight RNAV SID/STAR :2007-2008 10 main international airports RNAV1 Beijing, Shanghai(2), Guangzhou, Shenzhen, Wuhan, Shenyang, Xian, Chengdu, Wulumuqi
8
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 8 RNP - Approach AC 91-02 Feb.23 2006 Airworthiness and Operation requirement for special SAAAR RNP procedure Equivalent to FAA Notice 8000.326 AC 91-05 Dec.27 2006 Airworthiness and Operation requirement for public SAAAR RNP procedure Equivalent to FAA AC90-101 CAAC IB Jan.11, 2007 Construction criteria for RNP/AR procedure Equivalent to FAA Order 8260.52
9
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 9 RNP projects Lhasa,Boeing757,2004-2006 Linzhi Air China , B757-200,July 2006 China Eastern, B737-700,May 2007 Jiuzhai Air China , B757-200, Feb.2006 Airbus program More airports/airlines ……
10
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 10 RNP AR projects Lhasa, Night Flight, RNP0.3 June 2008 LiJiang China Eastern, Boeing, B737-700,May 2008 100% RNP0.3 operation (6 Boeing operators and 4 Airbus operators) YanJi, Bangda,HuangShan,XiNing Airport Develop common application package for operators
11
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 11 P
12
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 12 Linzhi RNP Location : Tibet , Valley of Yuluzhangbu River Elevation:2949m/9675ft Terrain: Narrow and steep valley High mountains of 4000m around the airport Complicated weather The most challenged airport in China 10,000,000 USD for ground Navaids
13
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 13 Linzhi
14
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 14
15
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 15
16
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 16 PBN Roadmap According to ICAO ’ s request Guidance for fully implementing PBN Time Frame:2009-2016-2025 Cooperation with Boeing Expected to be released in March 2009
17
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 17 Advise Circular AC 91-06 Feb. 2008 Operation Guidance for RNAV5 ICAO Template Recommend for Contract States
18
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 18 RNAV(GNSS) project Test flight in CAAC flight college Baro-VNAV combined Drafting AC on RNP APCH
19
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 19 RNP equipage Retrofit Project supported by CAAC Focused on B737NG and A320 family GPS Retrofit is also a part
20
31st Transportation Working Group Meeting Lima, Peru 25-29 August 2008 CAAC 20 THANK YOU 29th,May, Verification flight
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.