Presentation is loading. Please wait.

Presentation is loading. Please wait.

Panel A4 Summary WP4: short deadline for first deliverables; cannot expect the final product to look the same WP4: how to guarantee that a fabric node.

Similar presentations


Presentation on theme: "Panel A4 Summary WP4: short deadline for first deliverables; cannot expect the final product to look the same WP4: how to guarantee that a fabric node."— Presentation transcript:

1 Panel A4 Summary WP4: short deadline for first deliverables; cannot expect the final product to look the same WP4: how to guarantee that a fabric node will have a consistent configuration for a given job - send full tar file? Re-install from a repository? Update only the experiment- specific files?

2 WP4 Summary PPDG and GriPhyn have common member experiments but also non-overlapping ones. Will this cause problems? PPDG has a programme which corresponds to many DataGrid workpackages - but nothing corresponding to WP4 - fabric mgmt

3 WP4 Summary (thanks to Ruth for this overhead) How to translate the G word into useful and ubiquitous services? How to deliver what we propose? How will production systems be achieved? What are the boundaries and overlaps between the projects and experiments in the US and European projects? Do the US projects have gaps - e.g. WP4?


Download ppt "Panel A4 Summary WP4: short deadline for first deliverables; cannot expect the final product to look the same WP4: how to guarantee that a fabric node."

Similar presentations


Ads by Google