Name of ProjectABCStatusRemarks 1. Porac District Hospital10 M90% Accomp.On-going construction 2. Macabebe District Hospital (Phase 1) 10 M100% Accomp. 3. Macabebe District Hospital (Phase 2) 6,121,60065% Accomp.On-going construction
3
Name of Facility Porac District Hospital Classification Level 1 Location Porac, Pampanga Project Project Year HFEP 2012 Project Description Const. Dietary, Laundry, Mentainance Total Project Cost P13,000,000.00 Infrastructure P10,000,000.00 Equipment P 3,000,000.00 Status 90% Completed Remarks IHCPs w/ Center of Safety Accreditation
4
Name of Facility Macabebe Dist. Hosp. Classification Level 1 Location Macabebe, Pampanga Project Project Year HFEP 2012 Project Description Expansion/Repair/Renovatio n Total Project Cost P12,000,000.00 Infrastructure P10,000,000,00 Equipment P2,000,000.00 Status 100% Accomp. Remarks For turn-over
5
Name of ProjectABCStatusRemarks 1.Porac District Hospital (Phase 2) 1 M100% Accomp.
6
Name of Facility Macabebe Dist. Hosp. Classification Level 1 Location Macabebe, Pampanga Project Project Year HFEP 2012 Project Description Expansion/Repair/Renovatio n Total Project Cost P12,000,000.00 Infrastructure P10,000,000,00 Equipment P2,000,000.00 Status 100% Accomp. Remarks For turn-over
7
Implemented by DPWH- RO3 For the Province of Pampanga
8
Name of ProjectProject CostStatusRemarks 1. RHU VI EPZA Birthing Facility, Pulung Cacutud, Angeles City 2.5 M100% Accomp. Completed & Operational 2. RHU III Lourdes Sur East Birthing Facility, Angeles City 2.5 M100% Accomp. Non-functional 3. Bebe Anac BHS, Masantol, Pampanga 1.5 M Not yet started 4. Sagrada BHS, Masantol, Pampanga 3 M40% Accomp. On-going construction 5. San Roque BHS, Macabebe, Pampanga 1.5 M85% Accomp. On-going construction 6. Nabuklod BHS Birthing Facility, Floridablanca, Pampanga 2.5 M90% Accomp. On-going construction 7. Pio Ressettlement Birthing Facility (RHU 3), Porac, Pamp. 2.5 M100% Accomp. For Turn-over 8. Camias BHS, Birthing Facility, Porac, Pampanga 2.5 M50% Accomp. On-going construction 9. Sta. Rita RHU, Sta Rita, Pampanga 2.5 M70% Accomp. On-going construction 10. RHU 2 Bacolor Birthing Station, San Isidro, Bacolor, Pamp. 2.5 M10% Accomp. On-going construction 11. Concepcion BHS, San Simon, Pampanga 2 M70% Accomp. On-going construction 12. Dulong Ilog BHS, Candaba, Pampanga 3 M100% Accomp. For Turn-over 13. San Juan BHS, San Luis, Pampanga 2 M85% Accomp. On-going construction 14. Sta Cruz Pambilog BHS, San Luis, Pampanga 2 M60% Accomp. On-going construction 15. San Roque BHS, San Luis, Pampanga 2 M70% Accomp. On-going construction
9
RHU VI EPZA BIRTHING FACILITY PULUNG CACUTUD, ANGELES CITY COST: 2,500,000 (INFRA) 550,000 (EQUIPMENT) Remarks: 100% completed & operational
11
RHU lll LOURDES SUR EAST BIRTHING FACILITY ANGELES CITY COST: 2,500,000 (INFRA) 550,000 (EQUIPMENT) Remarks: BF non-functional due to lack electrical connections from local electric cooperative
13
BEBE ANAC BHS MASANTOL, PAMPANGA HFEP 2013 COST: P1,500,000 Remarks: Not yet started due to presence of PELCO post
15
SAGRADA BHS MASANTOL, PAMPANGA HFEP 2013 COST: P3,000,000 Remarks: Coastal barangay; 40% completed
17
SAN ROQUE BHS MACABEBE, PAMPANGA HFEP 2013 COST: P1,500,000 Remarks: 85% completed
19
NABUCLOD BHS BIRTHING FACILITY FLORIDABLANCA, PAMPANGA COST: 2,500,000 (INFRA) 550,000 (EQUIP) Remarks: 90% completed (main door, electrical installation)
21
PIO RESETTLEMENT BIRTHING FACILITY (RHU 3) PORAC, PAMPANGA COST: 2,500,000 Remarks: 100% completed; for turn-over
23
CAMIAS BHS BIRTHING FACILITY PORAC, PAMPANGA COST: 2,500,000 (INFRA) 1,050,000 (EQUIP) Remarks: 50% completed
25
STA. RITA RHU STA. RITA, PAMPANGA COST: 2,500,000 (INFRA) 550,000 (EQUIP) Remarks: 70% completed
27
RHU 2 BACOLOR BIRTHING STATION SAN ISIDRO, BACOLOR PAMPANGA COST: 2,500,000(INFRA) 550,000 (EQUIP) Remarks: 10% completed
29
CONCEPCION BHS SAN SIMON, PAMPANGA COST: P2,000,000 Remarks: 70% completed
31
DULONG ILOG BHS CANDABA, PAMPANGA COST: P3,000,000 Remarks: 100% completed; for turn-over
33
SAN JUAN BHS SAN LUIS, PAMPANGA COST: P2,000,000 Remarks: 85% completed
35
STA. CRUZ PAMBILOG BHS SAN LUIS, PAMPANGA COST: P2,000,000 Remarks: 60% completed
37
SAN ROQUE BHS SAN LUIS, PAMPANGA COST: P2,000,000 Remarks: 70% completed
39
SUMMARY TOTAL COST: 34, 500, 000 INFRA 3, 800, 000 EQUIPMENT 38, 300, 000 1- operational 3- 100% completed; for turn-over 1- not yet started 10- on-going construction TOTAL OF 15 HEALTH FACILITIES
40
For the Province of Pampanga Being Implemented by DOH-RO3
41
Name of ProjectsABCDescriptionRemarks 1. Sta. Lucia BHS, City of San Fernando 1 MRepair/Renovation & Expansion For bidding 2. Romana Pangan Dist Hosp, Floridablanca 10 MRepair/RenovationFor bidding 3. Floating Bancal Pugad BHS, Lubao 3 MNew ConstructionFor bidding 4. Consuelo RHU, Macabebe2 MNew ConstructionFor bidding 5. Sapang Kawayan RHU, Masantol2 MFor verificationFor bidding 6. Jose B. Lingad Mem Gen Hosp, City of San Fernando, Pampanga 3 MRepair & Upgrading of ICU/CCU Bldg For bidding
42
Name of ProjectABCDescriptionRemarks 1. Angeles City RHU II1.5 MRepair/RenovationFor bidding 2. Bacolor RHU I1.5 MNew ConstructionBidded 3. Lubao RHU III, Brgy. San Isidro1.5 MRepair of RHUFor bidding 4. Mabalacat RHU I, Pob.1.5 MCompletion of RHUFor bidding 5. Mabalacat RHU II, Dau1.5 MRepair/RenovationFor bidding 6. Macabebe RHU II (Brgy. San Rafael)1 MCompletion of RHUFor bidding 7. Magalang RHU I1.5 MExtension of RHUFor bidding 8. Magalang RHU II, San Ildefonso1.5 MRepair/UpgradingFor bidding 9. Mexico RHU IV, Pandacaqui1.5 MRepair/RenovationFor bidding 10. San Fernando City RHU II, Sindalan1.5 MExpansion of RHUFor bidding 11. San Luis RHU I, Sta. Cruz Pob.595,000Expansion of TB DotsFor bidding 12. Sasmuan RHU, Sta. Lucia Pob.716,000Completion of ProjectFor bidding 13. Sta. Ana RHU, San Joaquin (Pob)1.5 MUpgrading/ExpansionFor bidding 14. Bambang BHS, Candaba1 MRenovationFor bidding 15. Gulap BHS, Candaba1 MRenovationFor bidding 16. San Isidro MCH (RHU)1 MRenovationFor bidding 17. Macabebe RHU I1.725 MRenovationFor bidding 18. Bulaon BHS, City of San Fernando2 MRenovationBidded 19. Salapungan BHS, City of San Fernando2 MRenovationBidded 20. San Luis RHU1 MRenovationFor bidding
43
Name of ProjectABCDescriptionRemarks 1. San Juan RHU I, Apalit1.5 MNew ConstructionFor Bidding 2. Tabuyuc RHU II, Apalit1.5 MNew ConstructionFor Bidding 3. Floridablanca RHU II1.266 MNew ConstructionFor Bidding 4. Guagua RHU I1.5 MNew ConstructionFor Bidding 5. Mexico RHU II, San Jose Malino1.5 MConstruction of 2 Storey RHU For Bidding 6. Mexico RHU III, Sto. Domingo1.5 MNew ConstructionFor Bidding