Presentation is loading. Please wait.

Presentation is loading. Please wait.

17 December, 2004ACADS Milestone 1. 17 December, 2004ACADS Milestone 1 Presentation Summary.

Similar presentations


Presentation on theme: "17 December, 2004ACADS Milestone 1. 17 December, 2004ACADS Milestone 1 Presentation Summary."— Presentation transcript:

1 17 December, 2004ACADS Milestone 1

2 17 December, 2004ACADS Milestone 1 Presentation Summary

3 17 December, 2004ACADS Milestone 1 Identifying Customer Needs

4 17 December, 2004ACADS Milestone 1 Product Specifications NeedDescriptionUn.Marginal Value Ideal Value P1P2P3 11-54Process reactions“Fast”“V.Fast”“Slow” 249-54Power Input Rationum“Econ.”“Cheap”“Exp.” 343-48Fuel/Fuel designnum“Econ.”“Cheap”“Exp.” 455-60ADPInum> 9010061-96 load flow/design flow. load energy/design energy. % of locations of the occupied zone that meet specifications Target SpecificationsBenchmarking Test Prototype

5 17 December, 2004ACADS Milestone 1 Product Specifications (100 % occupancy) (50 % occupancy) (50 % occupancy – front half) (unoccupied) (25 % occupancy – back) INE Cinema Room Occupancy Statistics (Median Occupancy) 2003, 2nd Quarter 13,5% 2004, 2nd Quarter 11,9%

6 17 December, 2004ACADS Milestone 1 Prototyping Air Distribution System Prototype Film Type ApplicationScreen Width (w) Room width Room depth Room height 35 mmCommercial cinemas (100 to 350 seats) 7m14m21m8 m ScaleModel/Prototype Similarity Room width Room depth Room height Parts depth 20Difficult but sufficient70 cm105 cm40 cm105/2 15Medium93 cm140 cm53 cm140/2 10Good140 cm210 cm80 cm210/2 6Excellent

7 17 December, 2004ACADS Milestone 1 Patents and Intellectual Property

8 17 December, 2004ACADS Milestone 1 Patents and Intellectual Property €€€ € €€ € €€ €€€ €€

9 17 December, 2004ACADS Milestone 1 Patents and Intellectual Property

10 17 December, 2004ACADS Milestone 1


Download ppt "17 December, 2004ACADS Milestone 1. 17 December, 2004ACADS Milestone 1 Presentation Summary."

Similar presentations


Ads by Google