Keeping CES Healthy September 2003. CES Assessment Review the use of CES from the estimator’s perspective –A day and half on site at Florida, Minnesota,

Similar presentations


Presentation on theme: "Keeping CES Healthy September 2003. CES Assessment Review the use of CES from the estimator’s perspective –A day and half on site at Florida, Minnesota,"— Presentation transcript:

1 Keeping CES Healthy September 2003

2 CES Assessment Review the use of CES from the estimator’s perspective –A day and half on site at Florida, Minnesota, and Ohio –A half a day at Colorado Included hands-on walkthrough of common processes by the Estimators –Included IT representatives –Included Development and Implementation representatives

3 Agenda Environment Types/Number of users Current Issues Current Workflow Options

4 Environment Oracle database (CO Sybase) Client –OH – P2, 192 MB, XP –MN – P3, 256 MB, 2000 –FL – Citrix MetaFrame servers Better Speed –OH network and DB Access –MN client –FL overall

5 Users and usage Where –Combination of central and/or district Currently under 12 users per agency –More in the future as CES gets new use in the districts Item level, no parametric Mixture of reference prices, bid-based, and cost based pricing

6 Cost Sheets

7 Bid Histories By time range –1.5-year, 2-year, and 3-year By work type –Asphalt, Bridge, General Collapse items –With adhoc Minimum occurrences –With using IRANK

8 Workflow Primary process used 1)Check out data from PES –Project, and/or Proposal 2)Bring in tasks from defaults or snapshots 3)Update prices 4)Check-in to PES Other –Pavement determination

9 Import

10 Import

11 Import

12 Import

13 Job Information

14 Items Grid

15

16

17

18

19

20 Results Open in change mode by default Button for check-in/check-out Include choice to automatically bring in default tasks Set so default is to filter/select on Proposal/Project id ~14 steps to 2 steps

21 Items Tree

22

23

24 Results Icon designer is now in management

25 Items Tree

26 Reference Price

27 Overall Collected 60+ issues Classified and grouped into TMR’s –Created 16 new TMR’s from ~35 issues and scheduled for release by June 2004 –Identified 10 potential TMR’s for CES enhancements –Identified 10 potential TMR’s for BAMS/DSS enhancements Posted Update in July including top 4 issues from assessment

28 Conclusion ???

29 Conclusion ! GREAT IDEA !